Repository logoGCRIS
  • English
  • Türkçe
  • Русский
Log In
New user? Click here to register. Have you forgotten your password?
Home
Communities
Browse GCRIS
Entities
Overview
GCRIS Guide
  1. Home
  2. Browse by Author

Browsing by Author "Aslaner, Aysu"

Filter results by typing the first few letters
Now showing 1 - 1 of 1
  • Results Per Page
  • Sort Options
  • Loading...
    Thumbnail Image
    Conference Object
    Improving the Throughput of Pipe and Tube Production: A Case Study
    (Springer Science and Business Media Deutschland GmbH, 2021) Aytaç Ali Aslaner; Aysu Gürokur; Enes Turan; Karya Varol; Melisa Menemenlioğlu; Ömer Faruk Çorum; Yağmur Aydoğan; Nazlı Karatas Aygün; Erdinc Oner; Aslaner, Aysu; Turan, Enes; Öner, Erdinç; Gürokur, Aysu; Menemenlioğlu, Melisa; Çorum, Ömer Faruk; Varol, Karya; N.M. Durakbasa , M.G. Gençyılmaz
    The facility layout is an important issue affecting the productivity of manufacturing systems. For an organization to have an effective and efficient manufacturing unit special attention must be given to facility layout. Well-designed facilities result in efficient materials handling reduced resource transportation times and decreased production cycle times. Besides effective layouts are known to greatly impact operational performance. Improving the facility layout considering the flow amounts between machines improves the performance of the system. Designing an optimal layout provides the efficiency of material handling and reduces the distance traveled. In this study the locations and quantities of the work in process (WIP) inventory areas and the locations of the machines are determined. Mixed Integer Programming (MIP) is used for formulating and representing the problem. The objective function of the mathematical model is to minimize distances between the machines with high material flows. The mathematical model is solved using an optimization program. The iterative heuristic algorithm using the same optimization approach is designed as an alternative solution method to develop the mathematical model. In addition to the layout optimization the amount and the size of WIP inventory areas are calculated using the daily production plan. The results of the study are put together in an applicable user-friendly and adaptable Decision Support System (DSS). The new plant layout has been compared with the current plant layout using the DSS. The company will produce more effectively with less material handling using the DSS. © 2020 Elsevier B.V. All rights reserved.
Repository logo
Collections
  • Scopus Collection
  • WoS Collection
  • TrDizin Collection
  • PubMed Collection
Entities
  • Research Outputs
  • Organizations
  • Researchers
  • Projects
  • Awards
  • Equipments
  • Events
About
  • Contact
  • GCRIS
  • Research Ecosystems
  • Feedback
  • OAI-PMH

Log in to GCRIS Dashboard

GCRIS Mobile

Download GCRIS Mobile on the App StoreGet GCRIS Mobile on Google Play

Powered by Research Ecosystems

  • Privacy policy
  • End User Agreement
  • Feedback