Exergy analyses of a tunnel furnace and a tunnel dryer
Loading...

Date
2021
Authors
Gurhan Tahtali
Hayati Olgun
Mustafa Gunes
A. Hepbasli
Journal Title
Journal ISSN
Volume Title
Publisher
Inderscience Publishers
Open Access Color
Green Open Access
No
OpenAIRE Downloads
OpenAIRE Views
Publicly Funded
No
Abstract
The main objective of this study is to comprehensively perform exergy analysis of the tunnel furnace and the tunnel dryer which was selected as the control volume and involved in a brick production line. The analysis was based on the real data measured over a one-year period at a working brick factory with a daily production capacity of 392 tons of fired bricks. Energy and exergy efficiencies of the control volume were obtained to be 76.46% and 12.90% for dead state values of 25°C and 1.013 atm respectively. © 2021 Elsevier B.V. All rights reserved.
Description
Keywords
Brick Factory, Energy, Exergy Analysis, Tunnel Dryer, Tunnel Furnace, Brick, Exergy, Brick Factory, Brick Production, Control Volumes, Daily Production, Energy, Exergy Analysis, Production Capacity, Production Line, Tunnel Dryer, Tunnel Furnace, Dryers (equipment), Brick, Exergy, Brick factory, Brick production, Control volumes, Daily production, Energy, Exergy Analysis, Production capacity, Production line, Tunnel dryer, Tunnel furnace, Dryers (equipment), Optimization, Energy, brick factory, Kiln, Fuel, tunnel furnace, tunnel dryer, energy and exergy analysis
Fields of Science
0211 other engineering and technologies, 0202 electrical engineering, electronic engineering, information engineering, 02 engineering and technology
Citation
WoS Q
Scopus Q

OpenCitations Citation Count
N/A
Source
International Journal of Exergy
Volume
36
Issue
Start Page
208
End Page
Collections
PlumX Metrics
Citations
Scopus : 1
Captures
Mendeley Readers : 2
Google Scholar™


