Effective ensembles of heuristics for scheduling flexible job shop problem with new job insertion
Loading...

Date
2015
Authors
Kaizhou Gao
Ponnuthurai Nagaratnam Suganthan
M. Fatih Tasgetiren
Quanke Pan
Qiangqiang Sun
Journal Title
Journal ISSN
Volume Title
Publisher
Elsevier Ltd
Open Access Color
Green Open Access
Yes
OpenAIRE Downloads
OpenAIRE Views
Publicly Funded
No
Abstract
This study investigates the flexible job shop scheduling problem (FJSP) with new job insertion. FJSP with new job insertion includes two phases: initializing schedules and rescheduling after each new job insertion. Initializing schedules is the standard FJSP problem while rescheduling is an FJSP with different job start time and different machine start time. The time to do rescheduling is the same as the time of new job insertion. Four ensembles of heuristics are proposed for scheduling FJSP with new job insertion. The objectives are to minimize maximum completion time (makespan) to minimize the average of earliness and tardiness (E/T) to minimize maximum machine workload (Mworkload) and total machine workload (Tworkload). Extensive computational experiments are carried out on eight real instances from remanufacturing enterprise. The results and comparisons show the effectiveness of the proposed heuristics for solving FJSP with new job insertion. © 2015 Elsevier B.V. All rights reserved.
Description
Keywords
Ensemble, Flexible Job Shop Scheduling, Heuristic, Multiple Objectives, New Job Insertion, Optimization, Scheduling, Scheduling Algorithms, Ensemble, Flexible Job-shop Scheduling, Heuristic, Multiple-objectives, New Job Insertion, Job Shop Scheduling, Optimization, Scheduling, Scheduling algorithms, Ensemble, Flexible job-shop scheduling, Heuristic, Multiple-objectives, New job insertion, Job shop scheduling, Heuristic, Ensemble, Flexible Job Shop Scheduling, New Job Insertion, Multiple Objectives
Fields of Science
0211 other engineering and technologies, 02 engineering and technology
Citation
WoS Q
Scopus Q

OpenCitations Citation Count
63
Source
Computers & Industrial Engineering
Volume
90
Issue
Start Page
107
End Page
117
PlumX Metrics
Citations
CrossRef : 19
Scopus : 76
Captures
Mendeley Readers : 78
SCOPUS™ Citations
76
checked on Apr 09, 2026
Web of Science™ Citations
64
checked on Apr 09, 2026
Google Scholar™