Optimization of review periods and (S s) levels of floor stock items in a paint production environment

dc.contributor.author Banu Yetkin Yetkin Ekren
dc.contributor.author Gizem Mullaoğlu
dc.contributor.author Mullaoğlu, Gizem
dc.contributor.author Ekren, Banu Yetkin
dc.date.accessioned 2025-10-06T17:51:07Z
dc.date.issued 2020
dc.description.abstract In this paper a mixed integer linear programming model is proposed in order to optimize review periods and (s S) inventory levels of floor stock items (FSIs) in a paint production facility to decrease the number pauses in the production process. In the model power-of-two policy for periodic review scenario is considered. The optimum review periods are determined for multi-item types satisfying pre-defined cycle service level (CSL) under a capacity constraint. It is significant to determine the optimum review periods and safety stock levels of FSIs to be hold in the floor stock storage areas (FSSAs) so that the number of stops will be minimized in the production process. We model the problem as multi-item single-echelon inventory system using periodic review (s S) policy. In the facility raw materials are hold in nine inside inventory locations which are supplied from the main warehouse whose capacity is infinite. The objective function is considered as minimization of total number of reviews completed in a year i.e. the total number of transportations completed from the main warehouse. The results indicate that there is a positive correlation between the review periods and the difference between the S and s values. © 2020 Elsevier B.V. All rights reserved.
dc.description.sponsorship CINTAS, EATON Powering Business worldwide, EFR Certification, SIEMENS, ToolingTechGroup
dc.identifier.isbn 9781792361258, 9781532359507, 9780985549756, 9780985549770, 9781532359491, 9781792361234, 9781532359453, 9781532359460, 9781532359514, 9781792361265
dc.identifier.issn 21698767
dc.identifier.issn 2169-8767
dc.identifier.scopus 2-s2.0-85096608581
dc.identifier.uri https://www.scopus.com/inward/record.uri?eid=2-s2.0-85096608581&partnerID=40&md5=312fbe928cd036d07b163a1c35afe17f
dc.identifier.uri https://gcris.yasar.edu.tr/handle/123456789/9280
dc.language.iso English
dc.publisher IEOM Society
dc.relation.ispartof Proceedings of the 5th NA International Conference on Industrial Engineering and Operations Management IOEM 2020
dc.rights info:eu-repo/semantics/closedAccess
dc.subject (s, Cycle Service Level, Optimization, Power-of-two Policy, S) Policy
dc.subject (s
dc.subject Optimization
dc.subject Power-of-Two Policy
dc.subject Cycle Service Level
dc.subject S) Policy
dc.title Optimization of review periods and (S s) levels of floor stock items in a paint production environment
dc.type Conference Object
dspace.entity.type Publication
gdc.author.scopusid 57192639814
gdc.author.scopusid 23488489800
gdc.coar.type text::conference output
gdc.description.department
gdc.description.departmenttemp [Ekren B.Y.] Department of Industrial Engineering, Yasar University, Izmir, Turkey; [Mullaoğlu G.] Department of Industrial Engineering, Yasar University, Izmir, Turkey
gdc.description.issue August
gdc.description.publicationcategory Konferans Öğesi - Uluslararası - Kurum Öğretim Elemanı
gdc.index.type Scopus
gdc.scopus.citedcount 1
gdc.virtual.author Mullaoğlu, Gizem
gdc.virtual.author Yetkin Ekren, Banu
person.identifier.scopus-author-id Yetkin Ekren- Banu Yetkin (23488489800), Mullaoğlu- Gizem (57192639814)
publicationissue.issueNumber August
relation.isAuthorOfPublication 3b86d890-5241-4afc-b495-cbbc3b9f2be4
relation.isAuthorOfPublication b22482f1-7a68-4bca-ac09-234074b57d9a
relation.isAuthorOfPublication.latestForDiscovery 3b86d890-5241-4afc-b495-cbbc3b9f2be4
relation.isOrgUnitOfPublication ac5ddece-c76d-476d-ab30-e4d3029dee37
relation.isOrgUnitOfPublication.latestForDiscovery ac5ddece-c76d-476d-ab30-e4d3029dee37

Files