The Modification and the Line Balancing of an Assembly Line for the Inclusion of a New Product Model

dc.contributor.author Dilruba Telli
dc.contributor.author Yalcin Berberoglu
dc.contributor.author Gizem Karadeniz
dc.contributor.author Doğangün Yılmaz Uzun
dc.contributor.author Elif Baykal
dc.contributor.author Damla Yüksel
dc.contributor.author Yigit Kazancoglu
dc.contributor.author Yüksel, Damla
dc.contributor.author Karadeniz, Gizem
dc.contributor.author Telli, Dilruba
dc.contributor.author Berberoğlu, Yalçın
dc.contributor.author Kazançoğlu, Yiğit
dc.contributor.author Uzun, Doğangün Yılmaz
dc.contributor.author Baykal, Elif
dc.contributor.editor N.M. Durakbasa , M.N. Osman Zahid , R. Abd. Aziz , A.R. Yusoff , N. Mat Yahya , F. Abdul Aziz , M. Yazid Abu , M.G. Gençyilmaz
dc.date.accessioned 2025-10-06T17:51:11Z
dc.date.issued 2020
dc.description.abstract This study aims to modify the 5th lean assembly line in order to include a new product model in a combi boiler producer company. After reviewing customers’ needs company decides to produce a new product. New product model will be produced in the one of the existing lines in the plant. Most suitable line determined according to other product models job sequences’ similarity with new product models’. After the analysis of the production process the changes and possible constraints for the 5th assembly line are determined. After that solution procedures are developed the required calculations are made and implemented. The solutions are developed by various techniques and approaches such as Bubble diagram Value Stream Mapping Lean Production Line Balancing. Particularly mathematical model which is solved by IBM ILOG Optimization Studio programmed comprehensive analysis with a simulation model which is conducted by Arena Simulation software are presented in this study. The outcomes of the solutions are simulated compared and automatized. At the end three options are provided for the 5th lean line to include a new product type while continuing the production process with the current products. © 2022 Elsevier B.V. All rights reserved.
dc.identifier.doi 10.1007/978-3-030-31343-2_68
dc.identifier.isbn 9789819650583, 9783031991585, 9783031948886, 9789819667314, 9789811937156, 9783030703318, 9789811622779, 9789811969447, 9789819701056, 9789819748051
dc.identifier.isbn 9789811509490
dc.identifier.isbn 9783030313425
dc.identifier.issn 21954364, 21954356
dc.identifier.issn 2195-4356
dc.identifier.scopus 2-s2.0-85076210078
dc.identifier.uri https://www.scopus.com/inward/record.uri?eid=2-s2.0-85076210078&doi=10.1007%2F978-3-030-31343-2_68&partnerID=40&md5=bbec88cdc948dc9f9c6bbe81a9722b3d
dc.identifier.uri https://gcris.yasar.edu.tr/handle/123456789/9323
dc.identifier.uri https://doi.org/10.1007/978-3-030-31343-2_68
dc.language.iso English
dc.publisher Springer Science and Business Media Deutschland GmbH
dc.relation.ispartof 19th International Symposium for Production Research ISPR 2019
dc.rights info:eu-repo/semantics/closedAccess
dc.source Lecture Notes in Mechanical Engineering
dc.subject Lean Manufacturing, Line Balancing, Mathematical Modelling, Process Design, Simulation, Value Stream Mapping, Assembly, Assembly Machines, Balancing, Computer Software, Mapping, Product Design, Assembly Line, Customer Need, Lean Assemblies, Line Balancing, Mathematical Modeling, Producer Company, Product Models, Production Process, Simulation, Value Stream Mapping, Lean Production
dc.subject Assembly, Assembly machines, Balancing, Computer software, Mapping, Product design, Assembly line, Customer need, Lean assemblies, Line balancing, Mathematical modeling, Producer company, Product models, Production process, Simulation, Value stream mapping, Lean production
dc.subject Lean Manufacturing
dc.subject Line Balancing
dc.subject Value Stream Mapping
dc.subject Mathematical Modelling
dc.subject Simulation
dc.subject Process Design
dc.title The Modification and the Line Balancing of an Assembly Line for the Inclusion of a New Product Model
dc.type Conference Object
dspace.entity.type Publication
gdc.author.scopusid 57212214442
gdc.author.scopusid 57212214376
gdc.author.scopusid 59788142100
gdc.author.scopusid 58110648900
gdc.author.scopusid 15848066400
gdc.author.scopusid 57212207978
gdc.author.scopusid 57212210455
gdc.bip.impulseclass C5
gdc.bip.influenceclass C5
gdc.bip.popularityclass C5
gdc.coar.type text::conference output
gdc.collaboration.industrial false
gdc.description.department
gdc.description.departmenttemp [Telli D.] Department of Industrial Engineering, Yasar University, Bornova, Turkey; [Berberoğlu Y.] Department of Industrial Engineering, Yasar University, Bornova, Turkey; [Karadeniz G.] Department of Industrial Engineering, Yasar University, Bornova, Turkey; [Uzun D.Y.] Department of Industrial Engineering, Yasar University, Bornova, Turkey; [Baykal E.] Department of Industrial Engineering, Yasar University, Bornova, Turkey; [Yüksel D.] Department of Industrial Engineering, Yasar University, Bornova, Turkey; [Kazançoğlu Y.] Department of International Logistics Management, Yasar University, İzmir, Turkey
gdc.description.endpage 838
gdc.description.publicationcategory Konferans Öğesi - Uluslararası - Kurum Öğretim Elemanı
gdc.description.startpage 826
gdc.identifier.openalex W2982284736
gdc.index.type Scopus
gdc.oaire.diamondjournal false
gdc.oaire.impulse 0.0
gdc.oaire.influence 2.451169E-9
gdc.oaire.isgreen false
gdc.oaire.popularity 1.845476E-9
gdc.oaire.publicfunded false
gdc.openalex.collaboration National
gdc.openalex.fwci 0.0
gdc.openalex.normalizedpercentile 0.22
gdc.opencitations.count 1
gdc.plumx.crossrefcites 1
gdc.plumx.mendeley 6
gdc.plumx.scopuscites 1
gdc.scopus.citedcount 1
gdc.virtual.author Kazançoğlu, Yiğit
gdc.virtual.author Yüksel, Damla
oaire.citation.endPage 838
oaire.citation.startPage 826
person.identifier.scopus-author-id Telli- Dilruba (57212207978), Berberoglu- Yalcin (58110648900), Karadeniz- Gizem (57212214442), Uzun- Doğangün Yılmaz (57212214376), Baykal- Elif (59788142100), Yüksel- Damla (57212210455), Kazancoglu- Yigit (15848066400)
relation.isAuthorOfPublication cd2013c9-29e1-443f-8df4-2d1b140984ee
relation.isAuthorOfPublication cef696b1-1661-4ca4-9908-89fd99e3c246
relation.isAuthorOfPublication.latestForDiscovery cd2013c9-29e1-443f-8df4-2d1b140984ee
relation.isOrgUnitOfPublication ac5ddece-c76d-476d-ab30-e4d3029dee37
relation.isOrgUnitOfPublication.latestForDiscovery ac5ddece-c76d-476d-ab30-e4d3029dee37

Files