A mixed method for determination of cut-off dates in liner shipping

dc.contributor.author Aylin Çalışkan
dc.contributor.author Yeşim Deniz Özkan-Özen
dc.contributor.author Nazlican Gozacan
dc.date.accessioned 2025-10-06T17:49:14Z
dc.date.issued 2024
dc.description.abstract Operating with fixed schedules requires coordinating and cooperating with many actors in liner shipping. Therefore liner operators announce predetermined cut-off dates for each voyage for Sippers to perform cargo-related transactions and send their documents. The shippers complain that the cut-off times are primarily for the operator’s benefit and create a very tight time. However the operators have trouble that the shippers cannot fulfill the necessary instructions and documents on time. From this point of view this study aims to offer optimized cut-off determination for liner services and employs a mixed-method approach to evaluate the cut-off process of liner operators. Firstly a qualitative study was conducted to obtain factors affecting cut-off date determination. Second the factors affecting cut-off dates were analyzed with the fuzzy Total Interpretive Structural Modelling (TISM) method. Third a step-by-step shipping process from booking to the vessel’s departure was developed. Moreover the simulation method was applied with actual data to offer alternative schedules for a liner operator for its two liner services. The results show that even using only the two strongest driving factors determined in the TISM process (TEU capacity of the vessel and number of port calls) improves the cut-off determination simulation performance results by 20%. © 2024 Elsevier B.V. All rights reserved.
dc.identifier.doi 10.1080/03088839.2023.2180550
dc.identifier.issn 03088839
dc.identifier.issn 0308-8839
dc.identifier.issn 1464-5254
dc.identifier.uri https://www.scopus.com/inward/record.uri?eid=2-s2.0-85148594480&doi=10.1080%2F03088839.2023.2180550&partnerID=40&md5=22d7d6ac3ed6639cc4bb37bb09718388
dc.identifier.uri https://gcris.yasar.edu.tr/handle/123456789/8350
dc.language.iso English
dc.publisher Routledge
dc.relation.ispartof Maritime Policy & Management
dc.source Maritime Policy and Management
dc.subject Liner Schedule, On-time Shipping, Operation Strategy, Ship Scheduling, Shipping Optimization, Simulation, Computer Simulation, Maritime Transportation, Numerical Model, Port Development, Vessel
dc.subject computer simulation, maritime transportation, numerical model, port development, vessel
dc.title A mixed method for determination of cut-off dates in liner shipping
dc.type Article
dspace.entity.type Publication
gdc.bip.impulseclass C5
gdc.bip.influenceclass C5
gdc.bip.popularityclass C5
gdc.coar.type text::journal::journal article
gdc.collaboration.industrial false
gdc.description.endpage 866
gdc.description.startpage 848
gdc.description.volume 51
gdc.identifier.openalex W4321447685
gdc.index.type Scopus
gdc.oaire.diamondjournal false
gdc.oaire.impulse 1.0
gdc.oaire.influence 2.4420168E-9
gdc.oaire.isgreen false
gdc.oaire.popularity 2.6719684E-9
gdc.oaire.publicfunded false
gdc.oaire.sciencefields 0502 economics and business
gdc.oaire.sciencefields 05 social sciences
gdc.oaire.sciencefields 0211 other engineering and technologies
gdc.oaire.sciencefields 02 engineering and technology
gdc.openalex.collaboration National
gdc.openalex.fwci 0.4149
gdc.openalex.normalizedpercentile 0.65
gdc.opencitations.count 1
gdc.plumx.crossrefcites 1
gdc.plumx.mendeley 8
gdc.plumx.scopuscites 3
oaire.citation.endPage 866
oaire.citation.startPage 848
person.identifier.scopus-author-id Çalışkan- Aylin (57191166386), Özkan-Özen- Yeşim Deniz (57203788877), Gozacan- Nazlican (58112035900)
publicationissue.issueNumber 5
publicationvolume.volumeNumber 51
relation.isOrgUnitOfPublication ac5ddece-c76d-476d-ab30-e4d3029dee37
relation.isOrgUnitOfPublication.latestForDiscovery ac5ddece-c76d-476d-ab30-e4d3029dee37

Files