Exact analysis of production lines with Coxian-2-distributed processing times and parallel machines

dc.contributor.author Ozgun Yucel
dc.contributor.author Onder Bulut
dc.date SEP
dc.date.accessioned 2025-10-06T16:19:40Z
dc.date.issued 2021
dc.description.abstract This study considers production lines where each station has parallel machines with 2-phase Coxian processing times. The setting in this paper is designed specifically for scrutiny of the replenishment of raw materials and finished goods inventories with intermediate buffers in-between stations. Each buffer has a limit of capacity. Raw material supply and demand for finished goods are generated according to independent stationary Poisson processes. Coxian-2 processing times can be utilized to model failure-prone machines with exponential service times times to failure and repair times. The second phase of Coxian-2 can also be considered as a rework operation visited with a predefined probability. We model the line as a continuous-time Markov chain and propose recursive algorithms to generate the transition rate matrix. Although the general recursive form is specific to 3-station 4-buffer lines routines for calculating the number of states and generating the states work for any M-station (M + 1)-buffer systems. The developed model allows obtaining steady-state distribution and performance metrics such as throughput the average number of items in the buffers and average system cost consisting of production holding and shortage costs. Furthermore we enrich our study with numerical experiments and analyze the impacts of buffer capacities processing rates of the machines and the number of parallel machines on the system performance. Moreover the exact analysis provided in this paper can also be used as the decomposition block for the performance analysis of longer lines.
dc.identifier.doi 10.1016/j.cie.2021.107471
dc.identifier.issn 0360-8352
dc.identifier.uri http://dx.doi.org/10.1016/j.cie.2021.107471
dc.identifier.uri https://gcris.yasar.edu.tr/handle/123456789/5930
dc.language.iso English
dc.publisher PERGAMON-ELSEVIER SCIENCE LTD
dc.relation.ispartof Computers & Industrial Engineering
dc.source COMPUTERS & INDUSTRIAL ENGINEERING
dc.subject Production lines, Markovian analysis, Coxian distribution, Parallel machines
dc.subject RELIABLE PRODUCTION LINES, INTER STATION BUFFERS, IN-PROCESS INVENTORY, SERVICE TIMES, APPROXIMATE ANALYSIS, THROUGHPUT RATE, FLOW LINES, 2-MACHINE LINES, FINITE BUFFERS, ALLOCATION
dc.title Exact analysis of production lines with Coxian-2-distributed processing times and parallel machines
dc.type Article
dspace.entity.type Publication
gdc.bip.impulseclass C5
gdc.bip.influenceclass C5
gdc.bip.popularityclass C4
gdc.coar.type text::journal::journal article
gdc.collaboration.industrial false
gdc.description.startpage 107471
gdc.description.volume 159
gdc.identifier.openalex W3171692630
gdc.index.type WoS
gdc.oaire.diamondjournal false
gdc.oaire.impulse 3.0
gdc.oaire.influence 2.5462001E-9
gdc.oaire.isgreen false
gdc.oaire.popularity 3.6383416E-9
gdc.oaire.publicfunded false
gdc.oaire.sciencefields 0209 industrial biotechnology
gdc.oaire.sciencefields 0211 other engineering and technologies
gdc.oaire.sciencefields 02 engineering and technology
gdc.openalex.collaboration National
gdc.openalex.fwci 0.6526
gdc.openalex.normalizedpercentile 0.74
gdc.opencitations.count 3
gdc.plumx.mendeley 6
gdc.plumx.scopuscites 5
publicationvolume.volumeNumber 159
relation.isOrgUnitOfPublication ac5ddece-c76d-476d-ab30-e4d3029dee37
relation.isOrgUnitOfPublication.latestForDiscovery ac5ddece-c76d-476d-ab30-e4d3029dee37

Files