Bi-Criteria Single Machine Scheduling with Rate-Modifying-Activity

dc.contributor.author Yucel Ozturkoglu
dc.date.accessioned 2025-10-06T16:19:20Z
dc.date.issued 2013
dc.description.abstract In this paper we consider a single machine scheduling problem with two criteria: minimizing both total flow time with total tardiness and minimize maximum tardiness with number of tardy jobs. Unlike the classical scheduling problems we use a job position deterioration which means that the job processing time increases as a function of the job position. Besides deteriorated jobs we also consider rate-modifying-activities which alter the efficiency of the deteriorating processor. This is the first paper to combine both time dependent processing times and problems with rate-modifying-activity in the bi-criteria objectives. To solve the new type of problem we introduce a new scheduling mathematical model which is based on one developed Ozturkoglu and Bulfin [1]. To analyze the efficiency of the mathematical model we use three different approaches. According to computational results up to 50 jobs can be solved in less than one minute.
dc.identifier.issn 2147-1762
dc.identifier.uri https://gcris.yasar.edu.tr/handle/123456789/5748
dc.language.iso English
dc.publisher GAZI UNIV
dc.source GAZI UNIVERSITY JOURNAL OF SCIENCE
dc.subject Single-Machine Scheduling, Bi-criteria, Deteriorated Jobs, Rate-Modifying-Activity
dc.title Bi-Criteria Single Machine Scheduling with Rate-Modifying-Activity
dc.type Article
dspace.entity.type Publication
gdc.coar.type text::journal::journal article
gdc.index.type WoS
oaire.citation.endPage 106
oaire.citation.startPage 97
publicationissue.issueNumber 1
publicationvolume.volumeNumber 26
relation.isOrgUnitOfPublication ac5ddece-c76d-476d-ab30-e4d3029dee37
relation.isOrgUnitOfPublication.latestForDiscovery ac5ddece-c76d-476d-ab30-e4d3029dee37

Files