Bi-Criteria Single Machine Scheduling with Rate-Modifying-Activity
| dc.contributor.author | Yucel Ozturkoglu | |
| dc.date.accessioned | 2025-10-06T16:19:20Z | |
| dc.date.issued | 2013 | |
| dc.description.abstract | In this paper we consider a single machine scheduling problem with two criteria: minimizing both total flow time with total tardiness and minimize maximum tardiness with number of tardy jobs. Unlike the classical scheduling problems we use a job position deterioration which means that the job processing time increases as a function of the job position. Besides deteriorated jobs we also consider rate-modifying-activities which alter the efficiency of the deteriorating processor. This is the first paper to combine both time dependent processing times and problems with rate-modifying-activity in the bi-criteria objectives. To solve the new type of problem we introduce a new scheduling mathematical model which is based on one developed Ozturkoglu and Bulfin [1]. To analyze the efficiency of the mathematical model we use three different approaches. According to computational results up to 50 jobs can be solved in less than one minute. | |
| dc.identifier.issn | 2147-1762 | |
| dc.identifier.uri | https://gcris.yasar.edu.tr/handle/123456789/5748 | |
| dc.language.iso | English | |
| dc.publisher | GAZI UNIV | |
| dc.source | GAZI UNIVERSITY JOURNAL OF SCIENCE | |
| dc.subject | Single-Machine Scheduling, Bi-criteria, Deteriorated Jobs, Rate-Modifying-Activity | |
| dc.title | Bi-Criteria Single Machine Scheduling with Rate-Modifying-Activity | |
| dc.type | Article | |
| dspace.entity.type | Publication | |
| gdc.coar.type | text::journal::journal article | |
| gdc.index.type | WoS | |
| oaire.citation.endPage | 106 | |
| oaire.citation.startPage | 97 | |
| publicationissue.issueNumber | 1 | |
| publicationvolume.volumeNumber | 26 | |
| relation.isOrgUnitOfPublication | ac5ddece-c76d-476d-ab30-e4d3029dee37 | |
| relation.isOrgUnitOfPublication.latestForDiscovery | ac5ddece-c76d-476d-ab30-e4d3029dee37 |
