A Differential Evolution Algorithm for the Economic Lot Scheduling Problem

Loading...
Publication Logo

Date

2011

Authors

M. Fatih Tasgetiren
Onder Bulut
M. Murat Fadiloglu

Journal Title

Journal ISSN

Volume Title

Publisher

IEEE

Open Access Color

OpenAIRE Downloads

OpenAIRE Views

Research Projects

Journal Issue

Abstract

In this study we provide a Differential Evolution (DE) based heuristic to solve the Economic Lot Scheduling Problem (ELSP) under basic period approach. The problem is to find the best cyclic production schedule of n items to be produced on a single machine such that the production cycle of each item is an integer multiple of the basic period. The demand and the production rates are deterministic and known in advance. Our computational results suggest that our algorithm is competitive with the existing genetic algorithm and therefore it is promising for the solution of a generalized version of the problem which is called extended basic period approach in the future.

Description

Keywords

Economic lot scheduling, differential evolution, heuristic optimization, BASIC PERIOD, SIZES

Fields of Science

Citation

WoS Q

Scopus Q

Source

IEEE Symposium on Differential Evolution (SDE)

Volume

Issue

Start Page

End Page

Google Scholar Logo
Google Scholar™

Sustainable Development Goals

SDG data is not available