A Differential Evolution Algorithm for the Economic Lot Scheduling Problem
Loading...

Date
2011
Authors
M. Fatih Tasgetiren
Onder Bulut
M. Murat Fadiloglu
Journal Title
Journal ISSN
Volume Title
Publisher
IEEE
Open Access Color
OpenAIRE Downloads
OpenAIRE Views
Abstract
In this study we provide a Differential Evolution (DE) based heuristic to solve the Economic Lot Scheduling Problem (ELSP) under basic period approach. The problem is to find the best cyclic production schedule of n items to be produced on a single machine such that the production cycle of each item is an integer multiple of the basic period. The demand and the production rates are deterministic and known in advance. Our computational results suggest that our algorithm is competitive with the existing genetic algorithm and therefore it is promising for the solution of a generalized version of the problem which is called extended basic period approach in the future.
Description
Keywords
Economic lot scheduling, differential evolution, heuristic optimization, BASIC PERIOD, SIZES
Fields of Science
Citation
WoS Q
Scopus Q
Source
IEEE Symposium on Differential Evolution (SDE)
