Continuous Time MILP Models for Multi-Mode Resource Constrained Project Scheduling Problems
Loading...

Date
2020
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
IEEE
Open Access Color
Green Open Access
Yes
OpenAIRE Downloads
OpenAIRE Views
Publicly Funded
No
Abstract
Two new continuous-time MILP (Mixed Integer Linear Programming) models are developed for resource constrained project scheduling problems in which activities can be conducted in different (multi) modes. There are efficient and flexible MILP models for this problem in which time is represented by a number of discrete time intervals. However they require to use large numbers of binary variables as the number of activities increases and time horizon stretches. Hence efforts have been made to formulate MILP models based on continuous-time representation and therefore to speed up the solution process. We propose two novel MILP models based on the event and resource flow concepts. The models are verified by solving benchmark problems in the literature.
Description
Keywords
Project management, resource constrained project scheduling, MILP models, multi-mode activities, continuous time modeling, FORMULATIONS, Project Management, Resource Constrained Project Scheduling, Continuous Time Modeling, Multi-Mode Activities, MILP Models
Fields of Science
0211 other engineering and technologies, 0202 electrical engineering, electronic engineering, information engineering, 02 engineering and technology
Citation
WoS Q
Scopus Q

OpenCitations Citation Count
2
Source
9th International Conference on Industrial Technology and Management (ICITM)
Volume
Issue
Start Page
51
End Page
56
PlumX Metrics
Citations
CrossRef : 1
Scopus : 5
Captures
Mendeley Readers : 5
Google Scholar™


