A serial inventory system with lead-time-dependent backordering: A reduced-state approximation
| dc.contributor.author | Emre Berk | |
| dc.contributor.author | Ayhan Özgür Toy | |
| dc.contributor.author | Toy, Ayhan Ozgur | |
| dc.contributor.author | Berk, Emre | |
| dc.date.accessioned | 2025-10-06T17:49:46Z | |
| dc.date.issued | 2023 | |
| dc.description.abstract | We study a serial inventory system where the external customers may have a maximum time that they would be willing to wait for delivery in cases of stock-out and the demand would be lost if the remaining delivery lead time of the next available item is longer. This lead-time-dependent backordering behavior subsumes the models of partial backordering regardless of the wait that a customer would experience. In the inventory literature this behavior has only been analyzed in single-location settings. We study this behavior in a multi-stage setting. We consider continuous review (Formula presented.) policies at all stages facing external Poisson demands. Using the method of supplementary variables we define the stochastic process representing the inventory system and obtain the expressions for the operating characteristics of the inventory system. Based on the solution structures for the special cases we propose an approximate solution which rests on replacing the state-dependent purchasing decision of the customer with an averaged-out purchase probability computed using only the age of the oldest item. An extensive numerical study indicates that the proposed approximation performs very well. Our numerical study provides additional insights about the sensitivity and allocation of stock levels across stages. © 2022 Elsevier B.V. All rights reserved. | |
| dc.description.sponsorship | This research has been partially funded by TUBITAK (The Scientific and Technological Research Council of Turkey). We thank I.Kiric for his contribution at the early stages of this work. | |
| dc.description.sponsorship | Türkiye Bilimsel ve Teknolojik Araştırma Kurumu, TÜBİTAK | |
| dc.description.sponsorship | TUBITAK (The Scientific and Technological Research Council of Turkey) | |
| dc.description.sponsorship | This research has been partially funded by TUBITAK (The Scientific and Technological Research Council of Turkey). | |
| dc.identifier.doi | 10.1080/24725854.2022.2057625 | |
| dc.identifier.issn | 24725862, 24725854 | |
| dc.identifier.issn | 2472-5854 | |
| dc.identifier.issn | 2472-5862 | |
| dc.identifier.scopus | 2-s2.0-85129450823 | |
| dc.identifier.uri | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85129450823&doi=10.1080%2F24725854.2022.2057625&partnerID=40&md5=1490e615c96cbef52978b2fcfad22af3 | |
| dc.identifier.uri | https://gcris.yasar.edu.tr/handle/123456789/8604 | |
| dc.identifier.uri | https://doi.org/10.1080/24725854.2022.2057625 | |
| dc.language.iso | English | |
| dc.publisher | Taylor and Francis Ltd. | |
| dc.relation.ispartof | IISE Transactions | |
| dc.rights | info:eu-repo/semantics/closedAccess | |
| dc.source | IISE Transactions | |
| dc.subject | Inventory Theory And Control, Lead-time-dependent Backordering, Method Of Supplementary Variables, Multi-echelon Inventory, Inventory Control, Sales, Stochastic Systems, Backordering, Inventory Systems, Inventory Theory, Inventory Theory And Control, Lead-time-dependent Backordering, Leadtime, Method Of Supplementary Variable, Multi-echelon Inventory, Supplementary Variables, Time Dependent, Random Processes | |
| dc.subject | Inventory control, Sales, Stochastic systems, Backordering, Inventory systems, Inventory theory, Inventory theory and control, Lead-time-dependent backordering, Leadtime, Method of supplementary variable, Multi-echelon inventory, Supplementary variables, Time dependent, Random processes | |
| dc.subject | Multi-Echelon Inventory | |
| dc.subject | Inventory Theory and Control | |
| dc.subject | Method of Supplementary Variables | |
| dc.subject | Lead-Time-Dependent Backordering | |
| dc.title | A serial inventory system with lead-time-dependent backordering: A reduced-state approximation | |
| dc.type | Article | |
| dspace.entity.type | Publication | |
| gdc.author.id | Toy, Ayhan Ozgur/0000-0003-1603-6860 | |
| gdc.author.id | berk, emre/0000-0001-9674-5194 | |
| gdc.author.scopusid | 14521673500 | |
| gdc.author.scopusid | 6507972854 | |
| gdc.author.wosid | berk, emre/GXF-2453-2022 | |
| gdc.author.wosid | Toy, Ayhan Ozgur/F-2155-2017 | |
| gdc.bip.impulseclass | C5 | |
| gdc.bip.influenceclass | C5 | |
| gdc.bip.popularityclass | C5 | |
| gdc.coar.type | text::journal::journal article | |
| gdc.collaboration.industrial | false | |
| gdc.description.department | ||
| gdc.description.departmenttemp | [Berk, Emre] ID Bilkent Univ, Fac Business Adm, Bilkent, Turkey; [Toy, Ayhan Ozgur] Yasar Univ, Ind Engn Dept, Bornova, Turkey | |
| gdc.description.endpage | 270 | |
| gdc.description.issue | 3 | |
| gdc.description.publicationcategory | Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı | |
| gdc.description.startpage | 259 | |
| gdc.description.volume | 55 | |
| gdc.description.woscitationindex | Science Citation Index Expanded | |
| gdc.identifier.openalex | W4281640033 | |
| gdc.identifier.wos | WOS:000790769800001 | |
| gdc.index.type | Scopus | |
| gdc.index.type | WoS | |
| gdc.oaire.diamondjournal | false | |
| gdc.oaire.impulse | 3.0 | |
| gdc.oaire.influence | 2.4840934E-9 | |
| gdc.oaire.isgreen | true | |
| gdc.oaire.keywords | Inventory theory and control | |
| gdc.oaire.keywords | Lead-time-dependent backordering | |
| gdc.oaire.keywords | 518 | |
| gdc.oaire.keywords | Method of supplementary variables | |
| gdc.oaire.keywords | Multi-echelon inventory | |
| gdc.oaire.popularity | 3.1843237E-9 | |
| gdc.oaire.publicfunded | false | |
| gdc.oaire.sciencefields | 0502 economics and business | |
| gdc.oaire.sciencefields | 05 social sciences | |
| gdc.oaire.sciencefields | 0211 other engineering and technologies | |
| gdc.oaire.sciencefields | 02 engineering and technology | |
| gdc.openalex.collaboration | National | |
| gdc.openalex.fwci | 0.4119 | |
| gdc.openalex.normalizedpercentile | 0.65 | |
| gdc.opencitations.count | 3 | |
| gdc.plumx.crossrefcites | 1 | |
| gdc.plumx.mendeley | 12 | |
| gdc.plumx.scopuscites | 3 | |
| gdc.scopus.citedcount | 3 | |
| gdc.virtual.author | Toy, Ayhan Özgür | |
| gdc.wos.citedcount | 2 | |
| oaire.citation.endPage | 270 | |
| oaire.citation.startPage | 259 | |
| person.identifier.scopus-author-id | Berk- Emre (6507972854), Toy- Ayhan Özgür (14521673500) | |
| project.funder.name | This research has been partially funded by TUBITAK (The Scientific and Technological Research Council of Turkey). We thank I.Kiric for his contribution at the early stages of this work. | |
| publicationissue.issueNumber | 3 | |
| publicationvolume.volumeNumber | 55 | |
| relation.isAuthorOfPublication | 40d5f673-8a20-4e1f-b0a3-777528129295 | |
| relation.isAuthorOfPublication.latestForDiscovery | 40d5f673-8a20-4e1f-b0a3-777528129295 | |
| relation.isOrgUnitOfPublication | ac5ddece-c76d-476d-ab30-e4d3029dee37 | |
| relation.isOrgUnitOfPublication.latestForDiscovery | ac5ddece-c76d-476d-ab30-e4d3029dee37 |
