Effective ensembles of heuristics for scheduling flexible job shop problem with new job insertion

dc.contributor.author Kai Zhou Gao
dc.contributor.author Ponnuthurai Nagaratnam Suganthan
dc.contributor.author Mehmet Fatih Tasgetiren
dc.contributor.author Quan Ke Pan
dc.contributor.author Qiang Qiang Sun
dc.date DEC
dc.date.accessioned 2025-10-06T16:23:17Z
dc.date.issued 2015
dc.description.abstract This study investigates the flexible job shop scheduling problem (FJSP) with new job insertion. FJSP with new job insertion includes two phases: initializing schedules and rescheduling after each new job insertion. Initializing schedules is the standard FJSP problem while rescheduling is an FJSP with different job start time and different machine start time. The time to do rescheduling is the same as the time of new job insertion. Four ensembles of heuristics are proposed for scheduling FJSP with new job insertion. The objectives are to minimize maximum completion time (makespan) to minimize the average of earliness and tardiness (E/T) to minimize maximum machine workload (Mworkload) and total machine workload (Tworldoad). Extensive computational experiments are carried out on eight real instances from remanufacturing enterprise. The results and comparisons show the effectiveness of the proposed heuristics for solving FJSP with new job insertion. (C) 2015 Elsevier Ltd. All rights reserved.
dc.identifier.doi 10.1016/j.cie.2015.09.005
dc.identifier.issn 0360-8352
dc.identifier.uri http://dx.doi.org/10.1016/j.cie.2015.09.005
dc.identifier.uri https://gcris.yasar.edu.tr/handle/123456789/7778
dc.language.iso English
dc.publisher PERGAMON-ELSEVIER SCIENCE LTD
dc.relation.ispartof Computers & Industrial Engineering
dc.source COMPUTERS & INDUSTRIAL ENGINEERING
dc.subject Flexible job shop scheduling, Ensemble, Heuristic, New job insertion, Multiple objectives
dc.subject RANDOM MACHINE BREAKDOWNS, DISTRIBUTION ALGORITHM, GENETIC ALGORITHM, ROBUST, TIME
dc.title Effective ensembles of heuristics for scheduling flexible job shop problem with new job insertion
dc.type Article
dspace.entity.type Publication
gdc.bip.impulseclass C4
gdc.bip.influenceclass C4
gdc.bip.popularityclass C3
gdc.coar.type text::journal::journal article
gdc.collaboration.industrial false
gdc.description.endpage 117
gdc.description.startpage 107
gdc.description.volume 90
gdc.identifier.openalex W1549560875
gdc.index.type WoS
gdc.oaire.diamondjournal false
gdc.oaire.impulse 21.0
gdc.oaire.influence 8.468007E-9
gdc.oaire.isgreen true
gdc.oaire.popularity 3.553419E-8
gdc.oaire.publicfunded false
gdc.oaire.sciencefields 0211 other engineering and technologies
gdc.oaire.sciencefields 02 engineering and technology
gdc.openalex.collaboration International
gdc.openalex.fwci 13.7832
gdc.openalex.normalizedpercentile 0.99
gdc.openalex.toppercent TOP 10%
gdc.opencitations.count 63
gdc.plumx.crossrefcites 19
gdc.plumx.mendeley 78
gdc.plumx.scopuscites 76
oaire.citation.endPage 117
oaire.citation.startPage 107
person.identifier.orcid Suganthan- Ponnuthurai Nagaratnam/0000-0003-0901-5105, Tasgetiren- Mehmet Fatih/0000-0002-5716-575X, Pan- QUAN-KE/0000-0002-5022-7946, Tasgetiren- M. Fatih/0000-0001-8625-3671, gao- kaizhou/0000-0002-9252-6928,
publicationvolume.volumeNumber 90
relation.isOrgUnitOfPublication ac5ddece-c76d-476d-ab30-e4d3029dee37
relation.isOrgUnitOfPublication.latestForDiscovery ac5ddece-c76d-476d-ab30-e4d3029dee37

Files