A Variable Block Insertion Heuristic for Single Machine with Release Dates and Sequence Dependent Setup Times for Makespan Minimization

Loading...
Publication Logo

Date

2019

Authors

Jiaxin Fan
Damla Kizilay
Hande Oztop

Journal Title

Journal ISSN

Volume Title

Publisher

IEEE

Open Access Color

OpenAIRE Downloads

OpenAIRE Views

Research Projects

Journal Issue

Abstract

This paper is concerned with solving the single machine scheduling problem with release dates and sequence-dependent setup times in order to minimize the makespan. For this purpose a variable block insertion heuristic (VBIH) algorithm is applied to the problem. The VBIH algorithm performs block moves on a given solution. Mainly it removes a block of jobs with a given size from the solution and inserts the block into the best position of the partial solution. Furthermore we present a novel profile-fitting constructive heuristic for the problem. We evaluate the performance of the VBIH algorithm by comparisons with the beam search heuristic and the iterated greedy algorithm from the literature. Extensive computational results on the benchmark suite consisting of 900 instances from the literature show that the proposed VBIH algorithm is very competitive to the recent beam search heuristic and iterated greedy algorithm from the literature.

Description

Keywords

single machine scheduling, release dates, sequence-dependent setup times, variable block insertion heuristic, profile-fitting heuristic, TOTAL WEIGHTED TARDINESS, FLOWSHOP SCHEDULING PROBLEM, ALGORITHMS, SEARCH, Single Machine Scheduling, Release Dates, Sequence-Dependent Setup Times, Variable Block Insertion Heuristic, Profile-Fitting Heuristic

Fields of Science

Citation

WoS Q

Scopus Q

Source

IEEE Symposium Series on Computational Intelligence (SSCI)

Volume

Issue

Start Page

1676

End Page

1683
Web of Science™ Citations

2

checked on Apr 09, 2026

Google Scholar Logo
Google Scholar™

Sustainable Development Goals

SDG data is not available