Intelligent Benders’ Decomposition Algorithm for Sequencing Multi-model Assembly Line with Sequence Dependent Setup Times Problem: A Case Study in a Garment Industry

dc.contributor.author Elvin Sarı
dc.contributor.author Mert Paldrak
dc.contributor.author Yaren Can
dc.contributor.author Tunahan Kuzu
dc.contributor.author Sude Dila Ceylan
dc.contributor.author Devin Duran
dc.contributor.author Mustafa Arslan Ornek
dc.contributor.author Ozan Can Yıldız
dc.contributor.author Sarı, Elvin
dc.contributor.author Ceylan, Sude Dila
dc.contributor.author Can, Yaren
dc.contributor.author Kuzu, Tunahan
dc.contributor.author Duran, Devin
dc.contributor.author Paldrak, Mert
dc.contributor.author Yıldız, Ozan Can
dc.contributor.editor C. Kahraman , I.U. Sari , B. Oztaysi , S. Cevik Onar , S. Cebi , A.C. Tolga
dc.date.accessioned 2025-10-06T17:49:36Z
dc.date.issued 2023
dc.description.abstract In recent years clothing manufactures aim at producing various of products with low stock in order to meet customer demand. Besides this fact the ready-made clothing industry needs to pursue science technology and innovation policies to keep up with the rapid change in the fashion industry. One of the most commonly used production systems in garment industry is assembly lines where parts are subsequently added until the end product is obtained. In garment industry on time delivery plays a vital role in increasing customer satisfaction while ensuring demand. Consequently setup times in assembly lines are of paramount importance to track the performance of production system. In this study the minimization problem of long setup times due to the wide variety of models produced in the garment industry is handled. A real-life production management problem is defined formulated as an MIP model and solved to improve customer delivery rate and to increase efficiency by minimizing setup time. To solve this problem to optimality two exact solution techniques namely Branch and Bound and Benders’ Decomposition Techniques are taken into consideration. The proposed mathematical model is solved with ILOG CPLEX OPTIMIZATION STUDIO version 20.1 and the solutions obtained using each technique are compared with respect to solution quality and computational time. © 2023 Elsevier B.V. All rights reserved.
dc.identifier.doi 10.1007/978-3-031-39777-6_77
dc.identifier.isbn 9789819652372, 9783031931055, 9789819662968, 9783031999963, 9783031950162, 9783031947698, 9783032004406, 9783031910074, 9783031926105, 9789819639410
dc.identifier.isbn 9783031397769
dc.identifier.issn 23673389, 23673370
dc.identifier.issn 2367-3370
dc.identifier.scopus 2-s2.0-85172727687
dc.identifier.uri https://www.scopus.com/inward/record.uri?eid=2-s2.0-85172727687&doi=10.1007%2F978-3-031-39777-6_77&partnerID=40&md5=2bfbb2dc6de9f40af3c9f9a8ca62f35e
dc.identifier.uri https://gcris.yasar.edu.tr/handle/123456789/8530
dc.identifier.uri https://doi.org/10.1007/978-3-031-39777-6_77
dc.language.iso English
dc.publisher Springer Science and Business Media Deutschland GmbH
dc.relation.ispartof Intelligent and Fuzzy Systems - Intelligence and Sustainable Future Proceedings of the INFUS 2023 Conference
dc.rights info:eu-repo/semantics/closedAccess
dc.source Lecture Notes in Networks and Systems
dc.subject Garment Industry, Mip, Multi-model Assembly Line, Multi-objective, Sequence Dependent Setup Times, Assembly Machines, Customer Satisfaction, Sales, Assembly Line, Garment Industries, Mip, Model Assembly, Multi Objective, Multi-model Assembly Line, Multi-modelling, Production System, Sequence-dependent Setup Time, Set-up Time, Assembly
dc.subject Assembly machines, Customer satisfaction, Sales, Assembly line, Garment industries, MIP, Model assembly, Multi objective, Multi-model assembly line, Multi-modelling, Production system, Sequence-dependent setup time, Set-up time, Assembly
dc.subject Multi-Model Assembly Line
dc.subject Sequence Dependent Setup Times
dc.subject MIP
dc.subject Garment Industry
dc.subject Multi-objective
dc.title Intelligent Benders’ Decomposition Algorithm for Sequencing Multi-model Assembly Line with Sequence Dependent Setup Times Problem: A Case Study in a Garment Industry
dc.type Conference Object
dspace.entity.type Publication
gdc.author.scopusid 58623899000
gdc.author.scopusid 58614205300
gdc.author.scopusid 58614506500
gdc.author.scopusid 58614355400
gdc.author.scopusid 58614658900
gdc.author.scopusid 58614355300
gdc.author.scopusid 57192820563
gdc.bip.impulseclass C5
gdc.bip.influenceclass C5
gdc.bip.popularityclass C5
gdc.coar.type text::conference output
gdc.collaboration.industrial false
gdc.description.department
gdc.description.departmenttemp [Sarı E.] Industrial Engineering Department, Yaşar University, Bornova, İzmir, Turkey; [Paldrak M.] Industrial Engineering Department, Yaşar University, Bornova, İzmir, Turkey; [Can Y.] Industrial Engineering Department, Yaşar University, Bornova, İzmir, Turkey; [Kuzu T.] Industrial Engineering Department, Yaşar University, Bornova, İzmir, Turkey; [Ceylan S.D.] Industrial Engineering Department, Yaşar University, Bornova, İzmir, Turkey; [Duran D.] Industrial Engineering Department, Yaşar University, Bornova, İzmir, Turkey; [Örnek M.A.] Industrial Engineering Department, Yaşar University, Bornova, İzmir, Turkey; [Yıldız O.C.] Industrial Engineering Department, Yaşar University, Bornova, İzmir, Turkey
gdc.description.endpage 668
gdc.description.publicationcategory Konferans Öğesi - Uluslararası - Kurum Öğretim Elemanı
gdc.description.startpage 659
gdc.description.volume 759 LNNS
gdc.identifier.openalex W4385883123
gdc.index.type Scopus
gdc.oaire.diamondjournal false
gdc.oaire.impulse 0.0
gdc.oaire.influence 2.3811355E-9
gdc.oaire.isgreen false
gdc.oaire.popularity 1.9403348E-9
gdc.oaire.publicfunded false
gdc.openalex.collaboration National
gdc.openalex.fwci 0.0
gdc.openalex.normalizedpercentile 0.34
gdc.opencitations.count 0
gdc.plumx.mendeley 2
gdc.plumx.scopuscites 0
gdc.scopus.citedcount 0
gdc.virtual.author Örnek, Mustafa Arslan
gdc.virtual.author Paldrak, Mert
oaire.citation.endPage 668
oaire.citation.startPage 659
person.identifier.scopus-author-id Sarı- Elvin (58614658900), Paldrak- Mert (57192820563), Can- Yaren (58614205300), Kuzu- Tunahan (58614506500), Ceylan- Sude Dila (58614355400), Duran- Devin (58614355300), Ornek- Mustafa Arslan (55926629500), Yıldız- Ozan Can (58623899000)
publicationvolume.volumeNumber 759 LNNS
relation.isAuthorOfPublication 5432a2ed-1197-40db-b887-d0120928d4b9
relation.isAuthorOfPublication 986c669d-50fc-431a-a630-7652ca00d50f
relation.isAuthorOfPublication.latestForDiscovery 5432a2ed-1197-40db-b887-d0120928d4b9
relation.isOrgUnitOfPublication ac5ddece-c76d-476d-ab30-e4d3029dee37
relation.isOrgUnitOfPublication.latestForDiscovery ac5ddece-c76d-476d-ab30-e4d3029dee37

Files