An improved discrete artificial bee colony algorithm for the distributed permutation flowshop scheduling problem with preventive maintenance

dc.contributor.author Jiayang Mao
dc.contributor.author XiaoLu Hu
dc.contributor.author Quan-ke Pan
dc.contributor.author Zhonghua Miao
dc.contributor.author Chuangxin He
dc.contributor.author M. Fatih Tasgetiren
dc.contributor.editor J Fu
dc.contributor.editor J Sun
dc.coverage.spatial 39th Chinese Control Conference (CCC)
dc.date.accessioned 2025-10-06T16:21:40Z
dc.date.issued 2020
dc.description.abstract The distributed permutation flowshop scheduling problem with preventive maintenance operator (PM/DPFSP) is closely related to modem industry. This paper presents an improved discrete artificial bee colony (IDABC) algorithm for solving this problem. The criterion to be optimized is the makespan. An improved NEH heuristic method is proposed to initialize the population effectively. We adapted a local search method with insertion and swap operator to produce neighboring solutions in employ bee phase and onlooker bee phase. A global search method with destruction and reconstruction phase is introduced to avoid local optima in scout bee phase. The parameters for the proposed IDABC are calibrated by means of a design of experiments and analysis of variance. We conduct extensive experiments to test the performance of IDABC. Computational results indicate that IDABC has promising advantages on PM/DPFSP.
dc.identifier.isbn 978-988-15639-0-3
dc.identifier.issn 2161-2927
dc.identifier.uri https://gcris.yasar.edu.tr/handle/123456789/7004
dc.language.iso English
dc.publisher IEEE
dc.relation.ispartof 39th Chinese Control Conference (CCC)
dc.source PROCEEDINGS OF THE 39TH CHINESE CONTROL CONFERENCE
dc.subject Distributed scheduling, Flowshop, Preventive maintenance, Artificial bee colony
dc.subject ITERATED GREEDY ALGORITHM, SEARCH ALGORITHM, TOTAL FLOWTIME, MAKESPAN
dc.title An improved discrete artificial bee colony algorithm for the distributed permutation flowshop scheduling problem with preventive maintenance
dc.type Conference Object
dspace.entity.type Publication
gdc.coar.type text::conference output
gdc.index.type WoS
oaire.citation.endPage 1684
oaire.citation.startPage 1679
person.identifier.orcid Tasgetiren- M. Fatih/0000-0001-8625-3671, Pan- QUAN-KE/0000-0002-5022-7946, Tasgetiren- Mehmet Fatih/0000-0002-5716-575X,
project.funder.name National Science Foundation of China [61973203- 51575212], Shanghai Key Laboratory of Power station Automation Technology
relation.isOrgUnitOfPublication ac5ddece-c76d-476d-ab30-e4d3029dee37
relation.isOrgUnitOfPublication.latestForDiscovery ac5ddece-c76d-476d-ab30-e4d3029dee37

Files