A discrete artificial bee colony algorithm for the economic lot scheduling problem

Loading...
Publication Logo

Date

2011

Authors

M. Fatih Tasgetiren
Önder Bulut
Mehmet Murat Fadiloglu

Journal Title

Journal ISSN

Volume Title

Publisher

Open Access Color

Green Open Access

Yes

OpenAIRE Downloads

OpenAIRE Views

Publicly Funded

No
Impulse
Top 10%
Influence
Top 10%
Popularity
Average

Research Projects

Journal Issue

Abstract

In this study we present a discrete artificial bee colony (DABC) algorithm to solve the economic lot scheduling problem (ELSP) under extended basic period (EBP) approach and power-of-two (PoT) policy. In specific our algorithm provides a cyclic production schedule of n items to be produced on a single machine such that the production cycle of each item is an integer multiple of a fundamental cycle. All the integer multipliers are in the form of power-of-two and under EBP approach feasibility is guaranteed with a constraint that checks if the items assigned in each period can be produced within the length of the period. For this problem which is NP-hard our DABC algorithm employs a multi-chromosome solution representation to encode power-of-two multipliers and the production positions separately. Both feasible and infeasible solutions are maintained in the population through the use of some sophisticated constraint handling methods. A variable neighborhood search (VNS) algorithm is also fused into DABC algorithm to further enhance the solution quality. The experimental results show that the proposed algorithm is very competitive to the best performing algorithms from the existing literature under the EBP and PoT policy. © 2011 IEEE. © 2011 Elsevier B.V. All rights reserved.

Description

Keywords

Artificial Bee Colony Algorithm, Economic Lot Scheduling Problem, Extended Basic Period, Power-of-two Policy, Artificial Bee Colonies, Constraint Handling, Cyclic Production, Economic Lot Scheduling Problem, Economic Lot Scheduling Problems, Extended Basic Period, Fundamental Cycles, Np-hard, Power-of-two, Power-of-two Policies, Production Cycle, Single Machines, Solution Quality, Solution Representation, Variable Neighborhood Search, Evolutionary Algorithms, Artificial bee colonies, Constraint handling, Cyclic production, economic lot scheduling problem, Economic lot scheduling problems, extended basic period, Fundamental cycles, NP-hard, Power-of-two, Power-of-two policies, Production cycle, Single machines, Solution quality, Solution representation, Variable neighborhood search, Evolutionary algorithms

Fields of Science

0211 other engineering and technologies, 0202 electrical engineering, electronic engineering, information engineering, 02 engineering and technology

Citation

WoS Q

Scopus Q

OpenCitations Logo
OpenCitations Citation Count
10

Source

2011 IEEE Congress of Evolutionary Computation CEC 2011

Volume

Issue

Start Page

347

End Page

353
PlumX Metrics
Citations

CrossRef : 5

Scopus : 15

Captures

Mendeley Readers : 7

Google Scholar Logo
Google Scholar™
OpenAlex Logo
OpenAlex FWCI
5.2886

Sustainable Development Goals

SDG data is not available