A differential evolution algorithm for the economic lot scheduling problem

dc.contributor.author M. Fatih Tasgetiren
dc.contributor.author Önder Bulut
dc.contributor.author Mehmet Murat Fadiloglu
dc.date.accessioned 2025-10-06T17:53:00Z
dc.date.issued 2011
dc.description.abstract In this study we provide a Differential Evolution (DE) based heuristic to solve the Economic Lot Scheduling Problem (ELSP) under basic period approach. The problem is to find the best cyclic production schedule of n items to be produced on a single machine such that the production cycle of each item is an integer multiple of the basic period. The demand and the production rates are deterministic and known in advance. Our computational results suggest that our algorithm is competitive with the existing genetic algorithm and therefore it is promising for the solution of a generalized version of the problem which is called extended basic period approach in the future. © 2011 IEEE. © 2011 Elsevier B.V. All rights reserved.
dc.description.sponsorship IEEE Computational Intelligence Society
dc.identifier.doi 10.1109/SDE.2011.5952072
dc.identifier.isbn 9781612840727
dc.identifier.uri https://www.scopus.com/inward/record.uri?eid=2-s2.0-79961143411&doi=10.1109%2FSDE.2011.5952072&partnerID=40&md5=a8a8647da299db6cdfabae70bca2b657
dc.identifier.uri https://gcris.yasar.edu.tr/handle/123456789/10229
dc.language.iso English
dc.relation.ispartof Symposium Series on Computational Intelligence IEEE SSCI 2011 - 2011 IEEE Symposium on Differential Evolution SDE 2011
dc.subject Differential Evolution, Economic Lot Scheduling, Heuristic Optimization, Computational Results, Cyclic Production, Differential Evolution, Differential Evolution Algorithms, Economic Lot Scheduling, Economic Lot Scheduling Problems, Heuristic Optimization, Production Cycle, Production Rates, Single Machines, Artificial Intelligence, Biology, Evolutionary Algorithms
dc.subject Computational results, Cyclic production, Differential Evolution, Differential evolution algorithms, Economic lot scheduling, Economic lot scheduling problems, Heuristic optimization, Production cycle, Production rates, Single machines, Artificial intelligence, Biology, Evolutionary algorithms
dc.title A differential evolution algorithm for the economic lot scheduling problem
dc.type Conference Object
dspace.entity.type Publication
gdc.bip.impulseclass C5
gdc.bip.influenceclass C5
gdc.bip.popularityclass C5
gdc.coar.type text::conference output
gdc.collaboration.industrial false
gdc.description.endpage 6
gdc.description.startpage 1
gdc.identifier.openalex W2149781825
gdc.index.type Scopus
gdc.oaire.diamondjournal false
gdc.oaire.impulse 0.0
gdc.oaire.influence 2.6359381E-9
gdc.oaire.isgreen true
gdc.oaire.popularity 1.7974399E-9
gdc.oaire.publicfunded false
gdc.oaire.sciencefields 0211 other engineering and technologies
gdc.oaire.sciencefields 0202 electrical engineering, electronic engineering, information engineering
gdc.oaire.sciencefields 02 engineering and technology
gdc.openalex.collaboration National
gdc.openalex.fwci 0.0
gdc.openalex.normalizedpercentile 0.23
gdc.opencitations.count 5
gdc.plumx.crossrefcites 1
gdc.plumx.mendeley 5
gdc.plumx.scopuscites 8
oaire.citation.endPage 169
oaire.citation.startPage 164
person.identifier.scopus-author-id Tasgetiren- M. Fatih (6505799356), Bulut- Önder (35168573500), Fadiloglu- Mehmet Murat (6602212401)
relation.isOrgUnitOfPublication ac5ddece-c76d-476d-ab30-e4d3029dee37
relation.isOrgUnitOfPublication.latestForDiscovery ac5ddece-c76d-476d-ab30-e4d3029dee37

Files