Parallel Workforce Assignment Problem for Battery Production
| dc.contributor.author | Aslihan Erdosan | |
| dc.contributor.author | Aysenur Tali | |
| dc.contributor.author | Berfu Kircali | |
| dc.contributor.author | Buket Gunal | |
| dc.contributor.author | Ecem Nazli Dedecengiz | |
| dc.contributor.author | Damla Yuksel | |
| dc.contributor.author | Banu Yetkin Ekren | |
| dc.contributor.author | Yüksel, Damla | |
| dc.contributor.author | Erdosan, Aslihan | |
| dc.contributor.author | Günal, Buket | |
| dc.contributor.author | Dedecengiz, Ecem Nazlı | |
| dc.contributor.author | Ekren, Banu Yetkin | |
| dc.contributor.author | Erdoğan, Aslıhan | |
| dc.contributor.author | Talı, Ayşenur | |
| dc.contributor.author | Kırcalı, Berfu | |
| dc.contributor.editor | NM Durakbasa | |
| dc.contributor.editor | MG Gencyilmaz | |
| dc.coverage.spatial | ELECTR NETWORK | |
| dc.date.accessioned | 2025-10-06T16:19:22Z | |
| dc.date.issued | 2022 | |
| dc.description.abstract | This paper studies workforce assignment problem for battery production in a company in Turkey. Several types of batteries are produced in the studied company. Mostly the operations are semi-automated. In the production process the workers are assigned to multiple operations irregularly based on the priority of productions. In the company average utilization of worker is low and average cycle time of a product is high due to inefficient allocation of the workforce within the operations. In order to analyze the main system problem we simulate the system and observe the queue lengths to identify the bottlenecks. By dynamic assignment of workers at stations based on real time queue conditions the workloads can be balanced throughout the production lines. In this project a simulation-based system improvement is completed by applying: (i) dynamic utilization of workforce to reduce average cycle time of a battery (ii) assignment of parallel workforce where they can work for the same operation simultaneously and (iii) observation of real-time queue lengths of stations. Three dynamic assignment policies are developed and compared with each other. The best policy providing minimum cycle time for a battery production is selected to be the best. | |
| dc.description.sponsorship | This study is supported by TUBITAK (The Scientific and Technological Research Council of Turkey) in the program of 2209-B Undergraduate Research Projects for Industrial Applications Fellowship Program. We would like to thank our colleagues Serra Nur Colako.glu and Ya.gmur Irmak for their help and contribution to the study. | |
| dc.description.sponsorship | Acknowledgment. This study is supported by TUBITAK (The Scientific and Technological Research Council of Turkey) in the program of “2209-B Undergraduate Research Projects for Industrial Applications Fellowship Program”. We would like to thank our colleagues Serra Nur Çolakog˘lu and Yag˘mur Irmak for their help and contribution to the study. | |
| dc.description.sponsorship | TUBITAK; Türkiye Bilimsel ve Teknolojik Araştirma Kurumu, TÜBITAK | |
| dc.description.sponsorship | TUBITAK (The Scientific and Technological Research Council of Turkey) [2209-B] | |
| dc.identifier.doi | 10.1007/978-3-030-90421-0_64 | |
| dc.identifier.isbn | 978-3-030-90421-0, 978-3-030-90420-3 | |
| dc.identifier.isbn | 9783030904203 | |
| dc.identifier.isbn | 9783030904210 | |
| dc.identifier.issn | 2195-4356 | |
| dc.identifier.issn | 2195-4364 | |
| dc.identifier.scopus | 2-s2.0-85119859000 | |
| dc.identifier.uri | http://dx.doi.org/10.1007/978-3-030-90421-0_64 | |
| dc.identifier.uri | https://gcris.yasar.edu.tr/handle/123456789/5770 | |
| dc.identifier.uri | https://doi.org/10.1007/978-3-030-90421-0_64 | |
| dc.language.iso | English | |
| dc.publisher | SPRINGER-VERLAG SINGAPORE PTE LTD | |
| dc.relation.ispartof | 21st International Symposium on Production Research (ISPR) - Digitizing Production System | |
| dc.relation.ispartofseries | Lecture Notes in Mechanical Engineering | |
| dc.rights | info:eu-repo/semantics/closedAccess | |
| dc.source | DIGITIZING PRODUCTION SYSTEMS ISPR2021 | |
| dc.subject | Optimization, Assembly line balancing, Workforce allocation problem, Simulation modelling, Workforce change | |
| dc.subject | Assembly Line Balancing | |
| dc.subject | Workforce Allocation Problem | |
| dc.subject | Workforce Change | |
| dc.subject | Optimization | |
| dc.subject | Simulation Modelling | |
| dc.title | Parallel Workforce Assignment Problem for Battery Production | |
| dc.type | Conference Object | |
| dspace.entity.type | Publication | |
| gdc.author.id | Yetkin Ekren, Banu/0009-0009-4228-7795 | |
| gdc.author.id | YÜKSEL, DAMLA/0000-0003-4630-3325 | |
| gdc.author.scopusid | 57351522100 | |
| gdc.author.scopusid | 57352423100 | |
| gdc.author.scopusid | 57352423200 | |
| gdc.author.scopusid | 57352577700 | |
| gdc.author.scopusid | 57352577800 | |
| gdc.author.scopusid | 23488489800 | |
| gdc.author.scopusid | 57212210455 | |
| gdc.author.wosid | YÜKSEL, DAMLA/ABE-9888-2020 | |
| gdc.bip.impulseclass | C5 | |
| gdc.bip.influenceclass | C5 | |
| gdc.bip.popularityclass | C4 | |
| gdc.coar.type | text::conference output | |
| gdc.collaboration.industrial | false | |
| gdc.description.department | ||
| gdc.description.departmenttemp | [Erdosan, Aslihan; Tali, Aysenur; Kircali, Berfu; Gunal, Buket; Dedecengiz, Ecem Nazli; Yuksel, Damla; Ekren, Banu Yetkin] Yasar Univ, Dept Ind Engn, Izmir, Turkey | |
| gdc.description.endpage | 756 | |
| gdc.description.publicationcategory | Konferans Öğesi - Uluslararası - Kurum Öğretim Elemanı | |
| gdc.description.startpage | 747 | |
| gdc.description.woscitationindex | Conference Proceedings Citation Index - Science | |
| gdc.identifier.openalex | W3213841979 | |
| gdc.identifier.wos | WOS:000797796900066 | |
| gdc.index.type | WoS | |
| gdc.index.type | Scopus | |
| gdc.oaire.diamondjournal | false | |
| gdc.oaire.impulse | 2.0 | |
| gdc.oaire.influence | 2.5948361E-9 | |
| gdc.oaire.isgreen | true | |
| gdc.oaire.keywords | Optimization | |
| gdc.oaire.keywords | Simulation modelling | |
| gdc.oaire.keywords | Workforce change | |
| gdc.oaire.keywords | Workforce allocation problem | |
| gdc.oaire.keywords | Assembly line balancing | |
| gdc.oaire.popularity | 3.712261E-9 | |
| gdc.oaire.publicfunded | false | |
| gdc.openalex.collaboration | National | |
| gdc.openalex.fwci | 1.8836 | |
| gdc.openalex.normalizedpercentile | 0.87 | |
| gdc.opencitations.count | 3 | |
| gdc.plumx.mendeley | 3 | |
| gdc.plumx.scopuscites | 2 | |
| gdc.scopus.citedcount | 2 | |
| gdc.virtual.author | Yetkin Ekren, Banu | |
| gdc.virtual.author | Yüksel, Damla | |
| gdc.wos.citedcount | 2 | |
| oaire.citation.endPage | 756 | |
| oaire.citation.startPage | 747 | |
| person.identifier.orcid | Yetkin Ekren- Banu/0009-0009-4228-7795, YUKSEL- DAMLA/0000-0003-4630-3325, | |
| project.funder.name | TUBITAK (The Scientific and Technological Research Council of Turkey) [2209-B] | |
| relation.isAuthorOfPublication | b22482f1-7a68-4bca-ac09-234074b57d9a | |
| relation.isAuthorOfPublication | cef696b1-1661-4ca4-9908-89fd99e3c246 | |
| relation.isAuthorOfPublication.latestForDiscovery | b22482f1-7a68-4bca-ac09-234074b57d9a | |
| relation.isOrgUnitOfPublication | ac5ddece-c76d-476d-ab30-e4d3029dee37 | |
| relation.isOrgUnitOfPublication.latestForDiscovery | ac5ddece-c76d-476d-ab30-e4d3029dee37 |
