A constraint programming approach to a real-world workforce scheduling problem for multi-manned assembly lines with sequence-dependent setup times

Loading...
Publication Logo

Date

2024

Authors

Funda Güner
Abdül Kadir Görür
Benhür Satır
Levent Kandiller
John H. Drake

Journal Title

Journal ISSN

Volume Title

Publisher

Taylor and Francis Ltd.

Open Access Color

Green Open Access

Yes

OpenAIRE Downloads

OpenAIRE Views

Publicly Funded

No
Impulse
Top 10%
Influence
Average
Popularity
Top 10%

Research Projects

Journal Issue

Abstract

For over five decades researchers have presented various assembly line problems. Recently assembly lines with multiple workers at each workstation have become very common in the literature. These lines are often found in the manufacturing of large vehicles where workers at a workstation may perform their assigned tasks at the same time. Most research on multi-manned assembly lines focuses on balancing tasks and workers among workstations and scheduling tasks for workers. This study however concentrates on assigning tasks to workers already assigned to a specific workstation rather than balancing the entire line. The problem was identified through an industrial case study at a large vehicle manufacturing company. The study presents two methods one using mixed integer linear programming and the other using constraint programming to minimise the number of workers required on a multi-manned assembly line with sequence-dependent setup times. The results of the computational experiments indicate that the constraint programming method performs better than the mixed integer linear programming method on several modified benchmark instances from the literature. The constraint programming model is also tested on the real-world scenario of our industrial case study and leads to significant improvements in the productivity of the workstations. © 2024 Elsevier B.V. All rights reserved.

Description

Keywords

Constraint Programming, Mixed Integer Linear Programming, Multi-manned Assembly Line, Sequence-dependent Setup Times, Workforce Scheduling, Assembly, Assembly Machines, Benchmarking, Constraint Theory, Integer Programming, Personnel, Assembly Line, Constraint Programming, Integer Linear Programming, Large Vehicles, Mixed Integer Linear, Mixed Integer Linear Programming, Multi-manned Assembly Line, Sequence-dependent Setup Time, Workers', Workforce Scheduling, Assembly, Assembly machines, Benchmarking, Constraint theory, Integer programming, Personnel, Assembly line, Constraint programming, Integer Linear Programming, Large vehicles, Mixed integer linear, Mixed integer linear programming, Multi-manned assembly line, Sequence-dependent setup time, Workers', Workforce scheduling, Workforce Scheduling, Mixed Integer Linear Programming, Multi-Manned Assembly Line, Sequence-Dependent Setup Times, Constraint Programming

Fields of Science

0209 industrial biotechnology, 0211 other engineering and technologies, 02 engineering and technology

Citation

WoS Q

Scopus Q

OpenCitations Logo
OpenCitations Citation Count
12

Source

International Journal of Production Research

Volume

62

Issue

9

Start Page

3212

End Page

3229
PlumX Metrics
Citations

CrossRef : 4

Scopus : 15

Captures

Mendeley Readers : 16

Google Scholar Logo
Google Scholar™
OpenAlex Logo
OpenAlex FWCI
3.2088

Sustainable Development Goals