A constraint programming approach to a real-world workforce scheduling problem for multi-manned assembly lines with sequence-dependent setup times
Loading...

Date
2024
Authors
Funda Güner
Abdül Kadir Görür
Benhür Satır
Levent Kandiller
John H. Drake
Journal Title
Journal ISSN
Volume Title
Publisher
Taylor and Francis Ltd.
Open Access Color
Green Open Access
Yes
OpenAIRE Downloads
OpenAIRE Views
Publicly Funded
No
Abstract
For over five decades researchers have presented various assembly line problems. Recently assembly lines with multiple workers at each workstation have become very common in the literature. These lines are often found in the manufacturing of large vehicles where workers at a workstation may perform their assigned tasks at the same time. Most research on multi-manned assembly lines focuses on balancing tasks and workers among workstations and scheduling tasks for workers. This study however concentrates on assigning tasks to workers already assigned to a specific workstation rather than balancing the entire line. The problem was identified through an industrial case study at a large vehicle manufacturing company. The study presents two methods one using mixed integer linear programming and the other using constraint programming to minimise the number of workers required on a multi-manned assembly line with sequence-dependent setup times. The results of the computational experiments indicate that the constraint programming method performs better than the mixed integer linear programming method on several modified benchmark instances from the literature. The constraint programming model is also tested on the real-world scenario of our industrial case study and leads to significant improvements in the productivity of the workstations. © 2024 Elsevier B.V. All rights reserved.
Description
Keywords
Constraint Programming, Mixed Integer Linear Programming, Multi-manned Assembly Line, Sequence-dependent Setup Times, Workforce Scheduling, Assembly, Assembly Machines, Benchmarking, Constraint Theory, Integer Programming, Personnel, Assembly Line, Constraint Programming, Integer Linear Programming, Large Vehicles, Mixed Integer Linear, Mixed Integer Linear Programming, Multi-manned Assembly Line, Sequence-dependent Setup Time, Workers', Workforce Scheduling, Assembly, Assembly machines, Benchmarking, Constraint theory, Integer programming, Personnel, Assembly line, Constraint programming, Integer Linear Programming, Large vehicles, Mixed integer linear, Mixed integer linear programming, Multi-manned assembly line, Sequence-dependent setup time, Workers', Workforce scheduling, Workforce Scheduling, Mixed Integer Linear Programming, Multi-Manned Assembly Line, Sequence-Dependent Setup Times, Constraint Programming
Fields of Science
0209 industrial biotechnology, 0211 other engineering and technologies, 02 engineering and technology
Citation
WoS Q
Scopus Q

OpenCitations Citation Count
12
Source
International Journal of Production Research
Volume
62
Issue
9
Start Page
3212
End Page
3229
PlumX Metrics
Citations
CrossRef : 4
Scopus : 15
Captures
Mendeley Readers : 16
Google Scholar™


