Metaheuristic algorithms for the hybrid flowshop scheduling problem

Loading...
Publication Logo

Date

2019

Journal Title

Journal ISSN

Volume Title

Publisher

PERGAMON-ELSEVIER SCIENCE LTD

Open Access Color

Green Open Access

Yes

OpenAIRE Downloads

1

OpenAIRE Views

10

Publicly Funded

No
Impulse
Top 1%
Influence
Top 10%
Popularity
Top 1%

Research Projects

Journal Issue

Abstract

The hybrid flowshop scheduling problem (HFSP) has been widely studied in the literature as it has many real-life applications in industry. Even though many solution approaches have been presented for the HFSP with makespan criterion studies on HFSP with total flow time minimization have been rather limited. This study presents a mathematical model four variants of iterated greedy algorithms and a variable block insertion heuristic for the HFSP with total flow time minimization. Based on the well-known NEH heuristic an efficient constructive heuristic is also proposed and compared with NEH. A detailed design of experiment is carried out to calibrate the parameters of the proposed algorithms. The HFSP benchmark suite is used for evaluating the performance of the proposed methods. As there are only 10 large instances in the current literature further 30 large instances are proposed as new benchmarks. The developed model is solved for all instances on CPLEX under a time limit and the performances of the proposed algorithms are assessed through comparisons with the results from CPLEX and the two best-performing algorithms in literature. Computational results show that the proposed algorithms are very effective in terms of solution time and quality. Additionally the proposed algorithms are tested on large instances for the makespan criterion which reveal that they also perform superbly for the makespan objective. Especially for instances with 30 jobs the proposed algorithms are able to find the current incumbent makespan values reported in literature and provide three new best solutions. (C) 2019 Elsevier Ltd. All rights reserved.

Description

Keywords

Hybrid flowshop scheduling, Block insertion heuristic, Iterated greedy algorithm, Makespan, Total flow time, SEQUENCE-DEPENDENT SETUP, ITERATED GREEDY ALGORITHM, LOCAL SEARCH, BOUND ALGORITHM, SHOP, OPTIMIZATION, BRANCH, MACHINE, 2-STAGE, TIMES, Makespan, Iterated Greedy Algorithm, Total Flow Time, Block Insertion Heuristic, Hybrid Flowshop Scheduling, Makespan, Deterministic scheduling theory in operations research, total flow time, hybrid flowshop scheduling, makespan, Total Flow Time, Hybrid Flowshop Scheduling, Approximation methods and heuristics in mathematical programming, iterated greedy algorithm, block insertion heuristic, Block Insertion Heuristic, Iterated Greedy Algorithm

Fields of Science

0211 other engineering and technologies, 02 engineering and technology

Citation

WoS Q

Scopus Q

OpenCitations Logo
OpenCitations Citation Count
80

Source

Computers & Operations Research

Volume

111

Issue

Start Page

177

End Page

196
PlumX Metrics
Citations

CrossRef : 85

Scopus : 93

Captures

Mendeley Readers : 49

SCOPUS™ Citations

94

checked on Apr 09, 2026

Web of Science™ Citations

79

checked on Apr 09, 2026

Google Scholar Logo
Google Scholar™
OpenAlex Logo
OpenAlex FWCI
8.8399

Sustainable Development Goals

SDG data is not available