Artificial bee colony algorithm for scheduling and rescheduling fuzzy flexible job shop problem with new job insertion
Loading...

Date
2016
Authors
Kaizhou Gao
Ponnuthurai Nagaratnam Suganthan
Quanke Pan
M. Fatih Tasgetiren
Ali Sadollah
Journal Title
Journal ISSN
Volume Title
Publisher
Elsevier B.V.
Open Access Color
Green Open Access
Yes
OpenAIRE Downloads
OpenAIRE Views
Publicly Funded
No
Abstract
This study addresses flexible job shop scheduling problem (FJSP) with two constraints namely fuzzy processing time and new job insertion. The uncertainty of processing time and new job insertion are two scheduling related characteristics in remanufacturing. Fuzzy processing time is used to describe the uncertainty in processing time. Rescheduling operator is executed when new job(s) is (are) inserted into the schedule currently being executed. A two-stage artificial bee colony (TABC) algorithm with several improvements is proposed to solve FJSP with fuzzy processing time and new job insertion constraints. Also several new solution generation methods and improvement strategies are proposed and compared with each other. The objective is to minimize maximum fuzzy completion time. Eight instances from remanufacturing are solved using the proposed TABC algorithm. The proposed improvement strategies are compared and discussed in detail. Two proposed ABC algorithms with the best performances are compared against seven existing algorithms over by five benchmark cases. The optimization results and comparisons show the competitiveness of the proposed TABC algorithm for solving FJSP. © 2017 Elsevier B.V. All rights reserved.
Description
Keywords
Artificial Bee Colony, Flexible Job Shop Scheduling, Fuzzy Processing Time, New Job Insertion, Remanufacturing., Evolutionary Algorithms, Optimization, Scheduling, Scheduling Algorithms, Artificial Bee Colonies, Flexible Job-shop Scheduling, Fuzzy Processing Time, New Job Insertion, Remanufacturing, Job Shop Scheduling, Evolutionary algorithms, Optimization, Scheduling, Scheduling algorithms, Artificial bee colonies, Flexible job-shop scheduling, Fuzzy processing time, New job insertion, Remanufacturing, Job shop scheduling, Remanufacturing., Artificial Bee Colony, Fuzzy Processing Time, Flexible Job Shop Scheduling, New Job Insertion, Remanufacturing
Fields of Science
0202 electrical engineering, electronic engineering, information engineering, 02 engineering and technology
Citation
WoS Q
Scopus Q

OpenCitations Citation Count
122
Source
Knowledge-Based Systems
Volume
109
Issue
Start Page
1
End Page
16
PlumX Metrics
Citations
CrossRef : 43
Scopus : 151
Captures
Mendeley Readers : 108
SCOPUS™ Citations
151
checked on Apr 09, 2026
Web of Science™ Citations
132
checked on Apr 09, 2026
Google Scholar™



