A two-stage real world serial batching scheduling problem: a case study

Loading...
Publication Logo

Date

2024

Authors

Sadik Serhat Karakütük
Sener Akpinar
Mustafa Arslan Ornek

Journal Title

Journal ISSN

Volume Title

Publisher

Taylor and Francis Ltd.

Open Access Color

Green Open Access

No

OpenAIRE Downloads

OpenAIRE Views

Publicly Funded

No
Impulse
Average
Influence
Average
Popularity
Top 10%

Research Projects

Journal Issue

Abstract

This paper concerns a real-life production management problem composed of two stages which includes interdependent batch scheduling problems. Moreover both stages require setup operations at the beginning and between the subsequent batches. From the optimisation point of view this production management problem is complying with customers’ deadlines and hence minimising total lateness. To achieve this objective the production planner must identify optimum or near-optimum batch schedules for both stages. Correspondingly this paper aims to develop a methodology to manage the related production problem as accurately as possible. We formulate an optimisation model that employs the mathematical programming method in line with this. Afterwards an algorithmic proposal based on the simulated annealing algorithm is also developed to solve the problem in realistic sizes. The computational capabilities of the developed model and the algorithm are evaluated on the randomly generated problem sets. A direct comparison between the mathematical model and the algorithm shows how efficiently the proposed algorithm solves real-world problems. Also computational results indicate that the proposed algorithm satisfactorily solves the related real-world batch scheduling problem. © 2024 Elsevier B.V. All rights reserved.

Description

Keywords

Lateness Minimisation, Mathematical Programming, Serial Batching Scheduling Problem, Setup Times, Simulated Annealing Algorithm, Mathematical Programming, Production Control, Scheduling Algorithms, Annealing Algorithm, Batch-scheduling, Lateness Minimization, Management Problems, Production Management, Real-world, Scheduling Problem, Serial Batching Scheduling Problem, Set-up Time, Simulated Annealing Algorithm, Simulated Annealing, Mathematical programming, Production control, Scheduling algorithms, Annealing algorithm, Batch-scheduling, Lateness minimization, Management problems, Production management, Real-world, Scheduling problem, Serial batching scheduling problem, Set-up time, Simulated annealing algorithm, Simulated annealing

Fields of Science

Citation

WoS Q

Scopus Q

OpenCitations Logo
OpenCitations Citation Count
2

Source

Journal of the Operational Research Society

Volume

75

Issue

Start Page

2392

End Page

2403
PlumX Metrics
Citations

CrossRef : 1

Scopus : 2

Captures

Mendeley Readers : 6

Google Scholar Logo
Google Scholar™
OpenAlex Logo
OpenAlex FWCI
0.6985

Sustainable Development Goals