Propose a Polynomial Time Algorithm for Total Completion Time Objective
| dc.contributor.author | Yucel Ozturkoglu | |
| dc.contributor.author | Omer Ozturkoglu | |
| dc.contributor.author | Ozturkoglu, Yucel | |
| dc.contributor.author | Ozturkoglu, Omer | |
| dc.date | JUN | |
| dc.date.accessioned | 2025-10-06T16:20:02Z | |
| dc.date.issued | 2021 | |
| dc.description.abstract | In this study we integrate deteriorate jobs with repair&maintenance activity on a single machine scheduling subject to total completion time. This work has more than one motivation. First jobs are assigned to machines in an automated production line. Later to schedule the maintenance activities if needed to prevent machinery from breaking down later. There are some important mathematical models to solve this combination. However due to the complexity of the problem which is Np-hard a polynomial algorithm should be needed for solving large problems. Therefore this article introduces several polnomial algorithms to determine the order of things best. With using these algorithms it will be possible to determine where to assign to the schedule taking into account the number of maintenance activities required and their optimum total completion time. | |
| dc.identifier.doi | 10.33889/IJMEMS.2021.6.3.055 | |
| dc.identifier.issn | 2455-7749 | |
| dc.identifier.scopus | 2-s2.0-85107396111 | |
| dc.identifier.uri | http://dx.doi.org/10.33889/IJMEMS.2021.6.3.055 | |
| dc.identifier.uri | https://gcris.yasar.edu.tr/handle/123456789/6141 | |
| dc.identifier.uri | https://doi.org/10.33889/ijmems.2021.6.3.055 | |
| dc.identifier.uri | https://doi.org/10.33889/IJMEMS.2021.6.3.055 | |
| dc.language.iso | English | |
| dc.publisher | INT JOURNAL MATHEMATICAL ENGINEERING & MANAGEMENT SCIENCES-IJMEMS | |
| dc.relation.ispartof | International Journal of Mathematical, Engineering and Management Sciences | |
| dc.rights | info:eu-repo/semantics/openAccess | |
| dc.source | INTERNATIONAL JOURNAL OF MATHEMATICAL ENGINEERING AND MANAGEMENT SCIENCES | |
| dc.subject | Deteriorated job, Rate-modifying-activity, Scheduling, Total completion time | |
| dc.subject | SCHEDULING DETERIORATING JOBS, SINGLE-MACHINE, MAINTENANCE, MAKESPAN | |
| dc.subject | Rate-modifying-activity | |
| dc.subject | Scheduling | |
| dc.subject | Total Completion Time | |
| dc.subject | Deteriorated Job | |
| dc.title | Propose a Polynomial Time Algorithm for Total Completion Time Objective | |
| dc.type | Article | |
| dspace.entity.type | Publication | |
| gdc.author.id | OZTURKOGLU, OMER/0000-0003-3937-6657 | |
| gdc.author.scopusid | 37065136900 | |
| gdc.author.scopusid | 55173968900 | |
| gdc.author.wosid | ozturkoglu, yucel/AAX-6202-2020 | |
| gdc.author.wosid | OZTURKOGLU, OMER/B-8480-2019 | |
| gdc.bip.impulseclass | C5 | |
| gdc.bip.influenceclass | C5 | |
| gdc.bip.popularityclass | C5 | |
| gdc.coar.type | text::journal::journal article | |
| gdc.collaboration.industrial | false | |
| gdc.description.department | ||
| gdc.description.departmenttemp | [Ozturkoglu, Yucel] Yasar Univ, Logist Management, Izmir, Turkey; [Ozturkoglu, Omer] Yasar Univ, Business Adm, Izmir, Turkey | |
| gdc.description.endpage | 943 | |
| gdc.description.issue | 3 | |
| gdc.description.publicationcategory | Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı | |
| gdc.description.startpage | 932 | |
| gdc.description.volume | 6 | |
| gdc.description.woscitationindex | Emerging Sources Citation Index | |
| gdc.identifier.openalex | W3165886219 | |
| gdc.identifier.wos | WOS:000654044900013 | |
| gdc.index.type | WoS | |
| gdc.index.type | Scopus | |
| gdc.oaire.accesstype | GOLD | |
| gdc.oaire.diamondjournal | false | |
| gdc.oaire.impulse | 0.0 | |
| gdc.oaire.influence | 2.3811355E-9 | |
| gdc.oaire.isgreen | false | |
| gdc.oaire.keywords | total completion time | |
| gdc.oaire.keywords | Technology | |
| gdc.oaire.keywords | T | |
| gdc.oaire.keywords | rate-modifying-activity | |
| gdc.oaire.keywords | QA1-939 | |
| gdc.oaire.keywords | deteriorated job | |
| gdc.oaire.keywords | scheduling | |
| gdc.oaire.keywords | Mathematics | |
| gdc.oaire.popularity | 1.4634384E-9 | |
| gdc.oaire.publicfunded | false | |
| gdc.oaire.sciencefields | 0211 other engineering and technologies | |
| gdc.oaire.sciencefields | 02 engineering and technology | |
| gdc.openalex.collaboration | National | |
| gdc.openalex.fwci | 0.0 | |
| gdc.openalex.normalizedpercentile | 0.07 | |
| gdc.opencitations.count | 0 | |
| gdc.plumx.mendeley | 5 | |
| gdc.plumx.scopuscites | 0 | |
| gdc.scopus.citedcount | 0 | |
| gdc.virtual.author | Öztürkoğlu, Ömer | |
| gdc.virtual.author | Öztürkoğlu, Yücel | |
| gdc.wos.citedcount | 0 | |
| oaire.citation.endPage | 943 | |
| oaire.citation.startPage | 932 | |
| person.identifier.orcid | OZTURKOGLU- OMER/0000-0003-3937-6657 | |
| publicationissue.issueNumber | 3 | |
| publicationvolume.volumeNumber | 6 | |
| relation.isAuthorOfPublication | 55cf3173-f59b-4793-ad97-f2180069869b | |
| relation.isAuthorOfPublication | ccae1c59-a507-429b-87ab-6d245fb625b5 | |
| relation.isAuthorOfPublication.latestForDiscovery | 55cf3173-f59b-4793-ad97-f2180069869b | |
| relation.isOrgUnitOfPublication | ac5ddece-c76d-476d-ab30-e4d3029dee37 | |
| relation.isOrgUnitOfPublication.latestForDiscovery | ac5ddece-c76d-476d-ab30-e4d3029dee37 |
