Lagrangian heuristic for scheduling a steelmaking-continuous casting process
Loading...

Date
2013
Authors
Kun Mao
Quanke Pan
M. Fatih Tasgetiren
Journal Title
Journal ISSN
Volume Title
Publisher
Open Access Color
Green Open Access
Yes
OpenAIRE Downloads
OpenAIRE Views
Publicly Funded
No
Abstract
One of the biggest bottlenecks in iron and steel production is the steelmaking-continuous casting (SCC) process which consists of steel-making refining and continuous casting. The production scheduling of SCC is a complex hybrid flowshop (HFS) scheduling with following features: job grouping and precedence constraints no dead time inside the same group of jobs setup time constraints on the casters. A mixed-integer programming (MIP) model is established with the objective of minimizing the total weighted penalties of the earliness/tardiness and the job waiting. Through relaxing the operation precedence constraints to the objective function the relaxed problem can be decomposed into to smaller subproblems each of which corresponds a specific stage. A new dynamic programming algorithm is developed for solving the subproblems which are parallel machine scheduling problem with objective of minimizing total weighted completion time where the weights of jobs may be negative. The Lagrangian dual problem is solved by an improved subgradient level algorithm which can guarantee global convergence. A novel heuristic is presented to adjust subproblem solutions to obtain a feasible schedule. The computational results demonstrate that the propose LR approach can generate a high quality schedule within an acceptable computation time. © 2013 IEEE. © 2013 Elsevier B.V. All rights reserved.
Description
Keywords
Lagrangian Relaxation, Scheduling, Steelmaking-continuous Casting, Dynamic Programming Algorithm, Hybrid Flow-shop Scheduling (hfs), Iron And Steel Productions, Lagrangian Dual Problem, Lagrangian Relaxation, Mixed-integer Programming, Parallel Machine-scheduling Problems, Total Weighted Completion Time, Algorithms, Artificial Intelligence, Continuous Casting, Dynamic Programming, Integer Programming, Production Control, Production Engineering, Scheduling, Steelmaking, Dynamic programming algorithm, Hybrid flow-shop scheduling (HFS), Iron and steel productions, LaGrangian dual problem, LaGrangian relaxation, Mixed-Integer Programming, Parallel machine-scheduling problems, Total weighted completion time, Algorithms, Artificial intelligence, Continuous casting, Dynamic programming, Integer programming, Production control, Production engineering, Scheduling, Steelmaking
Fields of Science
0211 other engineering and technologies, 02 engineering and technology
Citation
WoS Q
Scopus Q

OpenCitations Citation Count
N/A
Source
2013 IEEE Symposium on Computational Intelligence in Scheduling CISched 2013 - 2013 IEEE Symposium Series on Computational Intelligence SSCI 2013
Volume
Issue
Start Page
68
End Page
74