Photovoltaic system assessment for a school building

dc.contributor.author Levent Bilir
dc.contributor.author Nurdan H. Yildirim
dc.date.accessioned 2025-10-06T17:51:57Z
dc.date.issued 2017
dc.description.abstract The installation of photovoltaic panels (PVs) on the roof of residential and commercial buildings is getting widespread as these areas stand normally idle and can be used for another purpose without losing an inhabited space. Considering the solar potential of Turkey a significant amount of electricity generation is possible using current PV technology. For this reason a two-story detached school building located in İzmir Turkey was taken into consideration and monthly as well as annual coverage ratio of an on-grid PV system for its entire energy requirement (including heating cooling and lighting) was investigated. The PVs were installed on the south face of the school building roof. A heat pump with a typical coefficient of performance (COP) value of 2.5 was used for supplying required cooling and heating. The heating cooling and lighting loads were determined on a monthly basis. The average monthly electrical energy generation of the mounted PVs was calculated using a written code in Energy Equation Solver (EES) software. As a result the monthly as well as yearly electrical energy demand coverage ratio values for the school using the installed PVs were revealed. Since the school building has a large south faced roof the installation of PVs is very suitable to meet the cumulative electrical energy need of the heat pump and the lighting load. For Case 1 180 PVs which supply the entire yearly demand (with a 110% coverage ratio) were taken into consideration while for Case 2 265 PVs which cover 75% of the roof area were evaluated. The results showed that between November and March PV electrical energy generation is not sufficient to meet all energy need of the school for both cases. However significant coverage ratio values were observed for the rest of the year. In a yearly basis the PV generation exceeded the building demand by 62% for the Case 2. This conclusion points out that the school can meet its yearly electricity need with the considered PV system and can even have an additional financial profit by selling its surplus PV electricity to the grid. Economic and environmental payback time values as well as simple payback time value were also computed for both investigated cases. The results pointed out a simple payback time of 7.9 years for Case 1 and 7.6 years for Case 2. Energy payback time was determined as 5 years for both systems. The greenhouse gas payback time of 2.7 years and 5.9 years was encountered for coal based and natural gas based calculations. © 2018 Elsevier B.V. All rights reserved.
dc.identifier.doi 10.1016/j.ijhydene.2017.02.122
dc.identifier.isbn 0080311393
dc.identifier.issn 03603199
dc.identifier.issn 0360-3199
dc.identifier.uri https://www.scopus.com/inward/record.uri?eid=2-s2.0-85015435464&doi=10.1016%2Fj.ijhydene.2017.02.122&partnerID=40&md5=c3abc58b62b75674fe2e60ca3daf23d2
dc.identifier.uri https://gcris.yasar.edu.tr/handle/123456789/9661
dc.language.iso English
dc.publisher Elsevier Ltd
dc.relation.ispartof International Journal of Hydrogen Energy
dc.source International Journal of Hydrogen Energy
dc.subject Coverage Ratio, Energy Analysis, Payback Time, Photovoltaics, Renewable Energy, School Building, Cooling, Energy Management, Greenhouse Gases, Heat Pump Systems, Lighting, Office Buildings, Photovoltaic Cells, Renewable Energy Resources, Roofs, Coverage Ratio, Energy Analysis, Payback Time, Photovoltaics, Renewable Energies, School Buildings
dc.subject Cooling, Energy management, Greenhouse gases, Heat pump systems, Lighting, Office buildings, Photovoltaic cells, Renewable energy resources, Roofs, Coverage ratio, Energy analysis, Payback time, Photovoltaics, Renewable energies, School buildings
dc.title Photovoltaic system assessment for a school building
dc.type Article
dspace.entity.type Publication
gdc.bip.impulseclass C4
gdc.bip.influenceclass C4
gdc.bip.popularityclass C4
gdc.coar.type text::journal::journal article
gdc.collaboration.industrial false
gdc.description.endpage 17868
gdc.description.startpage 17856
gdc.description.volume 42
gdc.identifier.openalex W2596714920
gdc.index.type Scopus
gdc.oaire.diamondjournal false
gdc.oaire.impulse 8.0
gdc.oaire.influence 4.1749826E-9
gdc.oaire.isgreen true
gdc.oaire.popularity 1.6840614E-8
gdc.oaire.publicfunded false
gdc.oaire.sciencefields 0211 other engineering and technologies
gdc.oaire.sciencefields 0202 electrical engineering, electronic engineering, information engineering
gdc.oaire.sciencefields 02 engineering and technology
gdc.openalex.collaboration National
gdc.openalex.fwci 0.9711
gdc.openalex.normalizedpercentile 0.74
gdc.opencitations.count 25
gdc.plumx.crossrefcites 1
gdc.plumx.mendeley 80
gdc.plumx.scopuscites 30
oaire.citation.endPage 17868
oaire.citation.startPage 17856
person.identifier.scopus-author-id Bilir- Levent (8639944900), Yildirim- Nurdan H. (14061388000)
publicationissue.issueNumber 28
publicationvolume.volumeNumber 42
relation.isOrgUnitOfPublication ac5ddece-c76d-476d-ab30-e4d3029dee37
relation.isOrgUnitOfPublication.latestForDiscovery ac5ddece-c76d-476d-ab30-e4d3029dee37

Files