Mathematical Models for No-Wait Permutation Flowshop Scheduling Problems
Loading...

Date
2023
Authors
Damla Yüksel
Levent Kandiller
M. Fatih Tasgetiren
Journal Title
Journal ISSN
Volume Title
Publisher
Springer Science and Business Media Deutschland GmbH
Open Access Color
Green Open Access
No
OpenAIRE Downloads
OpenAIRE Views
Publicly Funded
No
Abstract
In today's complex manufacturing industry no-wait permutation flowshop scheduling problems are one of the most encountered types of scheduling problems. The floor configuration of this type is the one with the restriction over the jobs that cannot wait between successive machines. The problem can be modeled from different points of view on the floor configuration. Hence in this study three mixed-integer programming models and two constraint programming models are studied on the no-wait permutation flowshop scheduling problems for the three objective functions: makespan total flow time and total tardiness. Among five mathematical models two are newly proposed to the literature on no-wait flowshop scheduling problems and three are previously studied for the variants of the no-wait flowshop scheduling problems. Complete experimentation is accomplished on the well-known benchmark set of Taillard. Regarding the computational experiments Model 4 performs best regarding the objective function value and the gap percentage reported in makespan and total flow time minimization. However for total tardiness although Model 3 performs best in terms of the gap percentage reported Model 4 still performs best in terms of the objective value reported. © 2023 Elsevier B.V. All rights reserved.
Description
Keywords
Makespan, Mathematical Models, No-wait Permutation Flowshop Scheduling Problem, Total Flow Time, Total Tardiness, Constraint Programming, Constraint Theory, Integer Programming, Complex Manufacturing, Flow Shop Scheduling Problem, Flowshop Scheduling Problems, Makespan, No Wait, No-wait Flowshop, No-wait Permutation Flowshop Scheduling Problem, Permutation Flowshop Scheduling Problems, Total Flowtime, Total Tardiness, Floors, Constraint programming, Constraint theory, Integer programming, Complex manufacturing, Flow shop scheduling problem, Flowshop scheduling problems, Makespan, No wait, No-wait flowshop, No-wait permutation flowshop scheduling problem, Permutation flowshop scheduling problems, Total flowtime, Total tardiness, Floors, Makespan, No-Wait Permutation Flowshop Scheduling Problem, Total Flow Time, Total Tardiness, Mathematical Models
Fields of Science
Citation
WoS Q
Scopus Q

OpenCitations Citation Count
N/A
Source
22nd International Symposium for Production Research ISPR 2022
Volume
Issue
Start Page
554
End Page
565
Collections
PlumX Metrics
Citations
Scopus : 1
Captures
Mendeley Readers : 1
Google Scholar™


