Uniform Parallel Machine Scheduling with Sequence Dependent Setup Times: A Randomized Heuristic
Loading...

Date
2022
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
SPRINGER-VERLAG SINGAPORE PTE LTD
Open Access Color
Green Open Access
No
OpenAIRE Downloads
OpenAIRE Views
Publicly Funded
No
Abstract
We consider the uniform parallel machine scheduling problem with sequence-dependent setup times to minimize the total completion times. This problem is known to be NP-hard. We propose a simple randomized heuristic with an improvement subroutine. We analyze the performance of the proposed heuristic through a computational study. Our computational study indicates that the heuristic performs well in terms of optimality gap and solution time
Description
ORCID
Keywords
Parallel machine scheduling, Sequence-dependent setup time, Full factorial design, Randomized heuristic, Uniform machines, Total completion times, METAHEURISTIC ALGORITHM, Full Factorial Design, Parallel Machine Scheduling, Total Completion Times, Sequence-Dependent Setup Time, Randomized Heuristic, Uniform Machines
Fields of Science
Citation
WoS Q
Scopus Q

OpenCitations Citation Count
N/A
Source
21st International Symposium on Production Research (ISPR) - Digitizing Production System
Volume
Issue
Start Page
812
End Page
825
PlumX Metrics
Citations
Scopus : 1
Captures
Mendeley Readers : 1
Google Scholar™


