Mehmet Cemali DİNÇERgörkem sariyerSariyer, GörkemDinçer, Mehmet Cemali2025-10-222018Altiok T. (1997) Performance analysis of manufacturing systems. New York: Springer VerlagAmari S.V. and Misra R.B. (1997) “Closed-form expressions for distribution of sum of exponential random variables.” IEEE Transactions on Reliability 46(4) 519-522Bonvik A.M. Dallery Y. and Gershwin S.B. (2000) “Approximate analysis of production systems operated by a CONWIP/finite buffer hybrid control policy” International Journal of Production Research 38 2845-2869Buzacott J.A. and Shanthikumar J.G. (1993). Stochastic models of manufacturing systems. Englewood Cliffs NJ: Prentice HallBorisovsky P. Dolgui A. and Kovalev S. (2012) “Modeling transfer line design problem via a set partitioning problem.” Optimization Letters 6 915-926Colledani M. et al. (2010) “Analytical methods to support continous improvements at scania” International Journal of Production Research 48(7) 1913-1945Dallery Y. David R. and Xie X.L. (1989) “Approximate analysis of transfer lines with unreliable macines and finite buffers” IEEE Transactions on Automatic Control 34(9) 943-953Dallery Y. and Le Bihan H. (1999) “An improved decomposition method for the analysis of production lines with unreliable machines and finite buffers” International Journal of Production Research 37(5) 1093-1117Dincer C. and Deler B. (2000) “On the distribution of throughput of transfer lines” Journal of the Operational Reseacrh Society 51 1170-1178Dolgui A. Finel B. Venadat F. Guschinsky N. and Levin G. (2005) “A heuristic approach for transfer line balancing” Journal of Intelligent Manufacturing 16 159-172Gershwin S.B. (1987) “An efficient decomposition method fort he approximate evaluation of tandem queues with finite storage space and blocking” Operations Research 35(2) 291-305Gershwin S.B. (1991) “Assembly/disassembly systems: an efficient decomposition algorithm for tree-structured networks” IIE Transactions 23(4) 302-314Gershwin S.B. and Burman M.H. (2000) “A decomposition method for analyzing inhomogenous assembly/disassembly systems” Annals of Operations Research 93(1-4) 91-115Gershwin S.B. and Werner L.M. (2007) “An approximate analytical method for evaluating the performance of closed-loop flow systems with unreliable machines and finite buffers.” International Journal of Production Research 45(14) 3085-3111Govil M.C. and Fu M.C. (1996) “Queueing theory in manufacturing: a survey.” Journal of Manufacturing Systems 18 214-240Guschinskaya O. and Dolgui A. (2009) “Comparison of exact and heuristic methods for a transfer line balancing problem.” International Journal of Production Economics 120 276-286Guschinskaya O. and Dolgui A. (2008) “A transfer line balancing problem by heuristic methods: Industrial case studies.” Decision Making in Manufacturing and Services 2(1) 33-46Guschinskaya O. and Dolgui A. Guschinski N. and Levin B. (2008) “A heuristic multi-start decomposition approach for optimal design of serial machining lines” European Journal of Operational Research 189 902-913Hany O. and Baki M.F. (2014) “Balancing transfer lines using Benders decomposition and ant colony optimization techniques” International Journal of Production Research 52(5) 1334-13350Helber S. and Jusic H. (2004) “A new decomposition approach for non-cyclic continous material flow lines with a merging flow of material.” Annals of Operations Research 125 117-139Helber S. (1998) “Decomposition of unreliable assembly/disassembly networkswith limited buffer capacity and random processing times” European Journal of Operational Research 109(1) 24-42Ignall E. and Silver A. (1977) “The output of a two-stage system with unreliable machines and limited storage.” IIE Transactions 9 183-188Li J. Blumenfeld D.E. and Alden J.M. (2006) “Comparisons of two-machine line models in throughput analysis.” International Journal of Production Research 44 1375-1398Li J. Blumenfeld D.E. Huang N. and Alden J.M. (2009) “Throughput analysis of production systems: recent advances and future topics.” International Journal of Production Research 47(14) 3823-3851Liu X.G. and Buzacott J.A. (1990) “Approximate models of assembly systems with finite inventory banks.” European Journal of Operational Research 45(2-3) 143-154Masood S. (2006) “Line balancing and simulation of an automated production transfer line.” Assembly Automation 26(1) 69-74Papadopoulus H.T. and Heavey C. (1996) “Queueing theory in manufacturing systems analysis and design: a classification of models for production and transfer lines.” European Journal of Operational Research 92(1) 1-27Wu K. and McGinnis L. (2012) “Performance evaluation for general queueing networks in manufacturing systems: Characterizing the trade-off between queue time and utilization.” European Journal of Operational Research 221 328-339Xia B. Xi L. and Zhou B. (2012) “An improved decomposition method for evaluating the performance of transfer lines with unreliable machines and finite buffers.” International Journal of Production Research 50(15) 4009-40242147-4575https://gcris.yasar.edu.tr/handle/123456789/10929https://search.trdizin.gov.tr/en/yayin/detay/291725Transfer line is a serial arrangement of machines where buffers are used to separate two consecutive machines. This special type of production systems have high production volumes. In the design and operation of transfer lines throughput analysis is essential. Considering the transient state of the systems this paper presents theoretical analysis for throughput rate of transfer lines. For the short transfer lines having a unique machine and two machines we derive throughput rate expected value and variance functions. We use these functions in performance evaluation of production systems. Besides these formulations can be used while analyzing longer transfer lines which can easily be decomposed into smaller sub-systemsİngilizceinfo:eu-repo/semantics/openAccessEndüstri MühendisliğiThroughput Analysis of Transfer Lines in Transient State: Using Exact Analytical MethodsArticle