Gurhan TahtaliHayati OlgunMustafa GunesArif HepbasliHepbasli, ArifOlgun, HayatiTahtali, GurhanGunes, Mustafa2025-10-0620211742-82971742-830010.1504/IJEX.2021.1187172-s2.0-85118877629http://dx.doi.org/10.1504/IJEX.2021.118717https://gcris.yasar.edu.tr/handle/123456789/7317https://doi.org/10.1504/IJEX.2021.118717The main objective of this study is to comprehensively perform exergy analysis of the tunnel furnace and the tunnel dryer which was selected as the control volume and involved in a brick production line. The analysis was based on the real data measured over a one-year period at a working brick factory with a daily production capacity of 392 tons of fired bricks. Energy and exergy efficiencies of the control volume were obtained to be 76.46% and 12.90% for dead state values of 25 degrees C and 1.013 atm respectively.Englishinfo:eu-repo/semantics/closedAccessbrick factory, tunnel furnace, tunnel dryer, energy and exergy analysisKILN, OPTIMIZATION, ENERGY, FUELBrick FactoryEnergy and Exergy AnalysisTunnel DryerTunnel FurnaceExergy AnalysisEnergyExergy analyses of a tunnel furnace and a tunnel dryerArticle