Comparison of exergoeconomic analysis of two different perlite expansion furnaces

Loading...
Publication Logo

Date

2015

Authors

Mert Gurturk
Hakan F. Oztop
Arif Hepbasli

Journal Title

Journal ISSN

Volume Title

Publisher

PERGAMON-ELSEVIER SCIENCE LTD

Open Access Color

Green Open Access

Yes

OpenAIRE Downloads

OpenAIRE Views

Publicly Funded

No
Impulse
Top 10%
Influence
Average
Popularity
Top 10%

Research Projects

Journal Issue

Abstract

In this study exergoeconomic analyses of two different perlite expansion furnaces are performed based on the actual operational data. The exergy cost and the cost per unit of exergy of the expanded perlite produced by the Former Perlite Expansion Furnace (FPEF) are determined to be 62.886 US$/h and 648.309 US5/GJ while those produced by the New Perlite Expansion Furnace (NPEF) are obtained to be 106.734 US$/h and 503.463 US5/GJ respectively. Additionally the production costs based on exergy are calculated to be 0.153 US$/kg for the FPEF and 0.102 US$/kg for the NPEF. The production costs based exergy and exergoeconomic factor of the FPEF are found to be 0.153 US$/kg and 45%. Those of the NPEF are obtained to be 0.102 US$/kg and the 67%. A novel method is also proposed for calculating the exergy cost per unit of the fuel. (C) 2014 Elsevier Ltd. All rights reserved.

Description

Keywords

Exergoeconomic, Furnace, Perlite, POWER-GENERATION SYSTEM, THERMOECONOMIC ANALYSIS, COMBINED HEAT, MILL PLANT, OPTIMIZATION, ENERGY, METHODOLOGY, GAS, Exergoeconomic, Furnace, Perlite

Fields of Science

0211 other engineering and technologies, 0202 electrical engineering, electronic engineering, information engineering, 02 engineering and technology

Citation

WoS Q

Scopus Q

OpenCitations Logo
OpenCitations Citation Count
10

Source

Energy

Volume

80

Issue

Start Page

589

End Page

598
PlumX Metrics
Citations

CrossRef : 4

Scopus : 13

Captures

Mendeley Readers : 19

Google Scholar Logo
Google Scholar™
OpenAlex Logo
OpenAlex FWCI
1.9015

Sustainable Development Goals