Job Scheduling Problem in the Production of Electrical Equipment
Loading...

Date
2023
Authors
Aybüke Aldemir
Batuhan Pancarcı
Buse Eylül Oral
Helin Şahin
İbrahim Onur Çakır
Zülfinaz Şahbaz
Adalet Oner
Gamze Erdem
Çağlar Çakır
Journal Title
Journal ISSN
Volume Title
Publisher
Springer Science and Business Media Deutschland GmbH
Open Access Color
Green Open Access
No
OpenAIRE Downloads
OpenAIRE Views
Publicly Funded
No
Abstract
In this paper a real-life parallel machine scheduling problem with sequence-dependent setup times of an industrial-type electrical equipment manufacturing company is addressed. The objective of this study is to find a solution method to achieve an effective and systematic schedule that minimizes the total weighted tardiness in the system by considering some properties related to the jobs and machines. These properties are the priority rank of jobs sequence-dependent setup times between jobs machine eligibility and machine availability. Initially a mathematical model is proposed for the problem. The solving performance of the proposed model by LINGO is tested with randomly generated toy problems. Since the problem has NP-hard characteristics heuristic algorithms based on the EDD rule and GTW algorithm are developed to obtain optimal or near-optimal schedules in an acceptable period of time. The success of the algorithms is tested through generated toy problems. It is observed that the combination of Modified EDD and HENOBA algorithms gives optimal or near-optimal solutions. Lastly an efficient and user-friendly decision support system (DSS) is created. © 2024 Elsevier B.V. All rights reserved.
Description
Keywords
Gtw Algorithm, Heuristic Methods, Job Scheduling, Mathematical Models, Parallel Machines, Artificial Intelligence, Decision Support Systems, Heuristic Algorithms, Job Shop Scheduling, Toys, Electrical Equipment, Equipment Manufacturing, Gtw Algorithm, Job Scheduling Problem, Jobs Scheduling, Manufacturing Companies, Parallel Machine, Parallel Machine-scheduling Problems, Property, Sequence-dependent Setup Time, Heuristic Methods, Artificial intelligence, Decision support systems, Heuristic algorithms, Job shop scheduling, Toys, Electrical equipment, Equipment manufacturing, GTW algorithm, Job scheduling problem, Jobs scheduling, Manufacturing companies, Parallel machine, Parallel machine-scheduling problems, Property, Sequence-dependent setup time, Heuristic methods, Heuristic Methods, GTW Algorithm, Parallel Machines, Job Scheduling, Mathematical Models
Fields of Science
Citation
WoS Q
Scopus Q

OpenCitations Citation Count
N/A
Source
22nd International Symposium for Production Research ISPR 2022
Volume
Issue
Start Page
818
End Page
830
Collections
PlumX Metrics
Citations
Scopus : 0
Captures
Mendeley Readers : 2
Google Scholar™


