Job Scheduling Problem in the Production of Electrical Equipment

Loading...
Publication Logo

Date

2023

Authors

Aybüke Aldemir
Batuhan Pancarcı
Buse Eylül Oral
Helin Şahin
İbrahim Onur Çakır
Zülfinaz Şahbaz
Adalet Oner
Gamze Erdem
Çağlar Çakır

Journal Title

Journal ISSN

Volume Title

Publisher

Springer Science and Business Media Deutschland GmbH

Open Access Color

Green Open Access

No

OpenAIRE Downloads

OpenAIRE Views

Publicly Funded

No
Impulse
Average
Influence
Average
Popularity
Average

Research Projects

Journal Issue

Abstract

In this paper a real-life parallel machine scheduling problem with sequence-dependent setup times of an industrial-type electrical equipment manufacturing company is addressed. The objective of this study is to find a solution method to achieve an effective and systematic schedule that minimizes the total weighted tardiness in the system by considering some properties related to the jobs and machines. These properties are the priority rank of jobs sequence-dependent setup times between jobs machine eligibility and machine availability. Initially a mathematical model is proposed for the problem. The solving performance of the proposed model by LINGO is tested with randomly generated toy problems. Since the problem has NP-hard characteristics heuristic algorithms based on the EDD rule and GTW algorithm are developed to obtain optimal or near-optimal schedules in an acceptable period of time. The success of the algorithms is tested through generated toy problems. It is observed that the combination of Modified EDD and HENOBA algorithms gives optimal or near-optimal solutions. Lastly an efficient and user-friendly decision support system (DSS) is created. © 2024 Elsevier B.V. All rights reserved.

Description

Keywords

Gtw Algorithm, Heuristic Methods, Job Scheduling, Mathematical Models, Parallel Machines, Artificial Intelligence, Decision Support Systems, Heuristic Algorithms, Job Shop Scheduling, Toys, Electrical Equipment, Equipment Manufacturing, Gtw Algorithm, Job Scheduling Problem, Jobs Scheduling, Manufacturing Companies, Parallel Machine, Parallel Machine-scheduling Problems, Property, Sequence-dependent Setup Time, Heuristic Methods, Artificial intelligence, Decision support systems, Heuristic algorithms, Job shop scheduling, Toys, Electrical equipment, Equipment manufacturing, GTW algorithm, Job scheduling problem, Jobs scheduling, Manufacturing companies, Parallel machine, Parallel machine-scheduling problems, Property, Sequence-dependent setup time, Heuristic methods, Heuristic Methods, GTW Algorithm, Parallel Machines, Job Scheduling, Mathematical Models

Fields of Science

Citation

WoS Q

Scopus Q

OpenCitations Logo
OpenCitations Citation Count
N/A

Source

22nd International Symposium for Production Research ISPR 2022

Volume

Issue

Start Page

818

End Page

830
PlumX Metrics
Citations

Scopus : 0

Captures

Mendeley Readers : 2

Google Scholar Logo
Google Scholar™
OpenAlex Logo
OpenAlex FWCI
0.0

Sustainable Development Goals