Production Scheduling at a Powder Coating Company
Loading...

Date
2021
Authors
Değer Demir
Ecem Ademoğlu
Gülce Gülen
Kerem Can Deliktaş
Mert Yandımata
Saadet Gül
Serdar Can Ertem
Önder Bulut
Sinem Özkan
Journal Title
Journal ISSN
Volume Title
Publisher
Springer Science and Business Media Deutschland GmbH
Open Access Color
Green Open Access
No
OpenAIRE Downloads
OpenAIRE Views
Publicly Funded
No
Abstract
In this study we consider parallel machine production scheduling problem of a Powder Coating company. A mathematical model with firm-specific constraints such as order splitting and machine availability is developed. The objective is to minimize the total weighted completion time of jobs. We propose two heuristic solution algorithms: A Genetic Algorithm and a Rule-Based Algorithm. For smaller instances each algorithm is compared with the optimum. On the other hand for larger instances we compare the performances of the proposed algorithms with each other. Furthermore we develop a simulation model to test the performances of the solutions determined by deterministic algorithms under randomness in setup times quality control times and downtimes. © 2020 Elsevier B.V. All rights reserved.
Description
Keywords
Genetic Algorithm, Heuristics, Machine Availability, Order Splitting, Rule Based Algorithm, Scheduling, Genetic Algorithm, Scheduling, Heuristics, Rule Based Algorithm, Machine Availability, Order Splitting
Fields of Science
Citation
WoS Q
Scopus Q

OpenCitations Citation Count
N/A
Source
International Symposium for Production Research ISPR 2020
Volume
Issue
Start Page
989
End Page
1001
Collections
PlumX Metrics
Citations
Scopus : 0
Captures
Mendeley Readers : 2
Google Scholar™


