Production Scheduling at a Powder Coating Company

Loading...
Publication Logo

Date

2021

Authors

Değer Demir
Ecem Ademoğlu
Gülce Gülen
Kerem Can Deliktaş
Mert Yandımata
Saadet Gül
Serdar Can Ertem
Önder Bulut
Sinem Özkan

Journal Title

Journal ISSN

Volume Title

Publisher

Springer Science and Business Media Deutschland GmbH

Open Access Color

Green Open Access

No

OpenAIRE Downloads

OpenAIRE Views

Publicly Funded

No
Impulse
Average
Influence
Average
Popularity
Average

Research Projects

Journal Issue

Abstract

In this study we consider parallel machine production scheduling problem of a Powder Coating company. A mathematical model with firm-specific constraints such as order splitting and machine availability is developed. The objective is to minimize the total weighted completion time of jobs. We propose two heuristic solution algorithms: A Genetic Algorithm and a Rule-Based Algorithm. For smaller instances each algorithm is compared with the optimum. On the other hand for larger instances we compare the performances of the proposed algorithms with each other. Furthermore we develop a simulation model to test the performances of the solutions determined by deterministic algorithms under randomness in setup times quality control times and downtimes. © 2020 Elsevier B.V. All rights reserved.

Description

Keywords

Genetic Algorithm, Heuristics, Machine Availability, Order Splitting, Rule Based Algorithm, Scheduling, Genetic Algorithm, Scheduling, Heuristics, Rule Based Algorithm, Machine Availability, Order Splitting

Fields of Science

Citation

WoS Q

Scopus Q

OpenCitations Logo
OpenCitations Citation Count
N/A

Source

International Symposium for Production Research ISPR 2020

Volume

Issue

Start Page

989

End Page

1001
PlumX Metrics
Citations

Scopus : 0

Captures

Mendeley Readers : 2

Google Scholar Logo
Google Scholar™
OpenAlex Logo
OpenAlex FWCI
0.5763

Sustainable Development Goals

SDG data is not available