Optimization of review periods and (S s) levels of floor stock items in a paint production environment
Loading...

Date
2020
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
IEOM Society
Open Access Color
OpenAIRE Downloads
OpenAIRE Views
Abstract
In this paper a mixed integer linear programming model is proposed in order to optimize review periods and (s S) inventory levels of floor stock items (FSIs) in a paint production facility to decrease the number pauses in the production process. In the model power-of-two policy for periodic review scenario is considered. The optimum review periods are determined for multi-item types satisfying pre-defined cycle service level (CSL) under a capacity constraint. It is significant to determine the optimum review periods and safety stock levels of FSIs to be hold in the floor stock storage areas (FSSAs) so that the number of stops will be minimized in the production process. We model the problem as multi-item single-echelon inventory system using periodic review (s S) policy. In the facility raw materials are hold in nine inside inventory locations which are supplied from the main warehouse whose capacity is infinite. The objective function is considered as minimization of total number of reviews completed in a year i.e. the total number of transportations completed from the main warehouse. The results indicate that there is a positive correlation between the review periods and the difference between the S and s values. © 2020 Elsevier B.V. All rights reserved.
Description
Keywords
(s, Cycle Service Level, Optimization, Power-of-two Policy, S) Policy, (s, Optimization, Power-of-Two Policy, Cycle Service Level, S) Policy
Fields of Science
Citation
WoS Q
Scopus Q
Source
Proceedings of the 5th NA International Conference on Industrial Engineering and Operations Management IOEM 2020
Volume
Issue
August
